• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-20 21:14来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (5)
 Remove the screws (10) and the washers (11).

 (6)
 Remove the CVR microphone amplifier (12) from the support (8).


 1EFF : ALL 1 23-71-14Page 402 1 1 Feb 01/98 1 1 1CES 1


 CVR Microphone Amplifier
 Figure 401/TASK 23-71-14-991-001
 1EFF :  ALL  1  23-71-14 Page 403 
1  1  Feb 01/98
 1  1
 1CES  1

 

 TASK 23-71-14-400-001
 Installation of the CVR Microphone Amplifier (18RK)

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
23-71-00-710-001  Operational Test of the CVR and the CVR Channel Recording 23-71-14-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 23-71-14-865-051
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU COM/CVR/SPLY 2RK E14 49VU COM/CVR/CTL 4RK E13
 4. Procedure
_________ (Ref. Fig. 401/TASK 23-71-14-991-001) Subtask 23-71-14-420-050
 A. Installation of the CVR Microphone Amplifier
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Put the CVR microphone amplifier (12) in position on its support (8).


 1EFF : ALL 1 23-71-14Page 404 1 1 Feb 01/98 1 1 1CES 1


 (4)
 Install the washers (11) and the screws (10). Tighten the screws.

 (5)
 Remove the blanking caps from the connectors (7) and the receptacles (9).

 (6)
 Make sure that the connectors (7) and the receptacles (9) are in the correct condition.

 (7)
 Connect the connectors (7) to the receptacles (9).

 (8)
 Put the dome light cover (2) in position. Install the screws (1) and tighten the screws (1) and the fasteners (3).

 (9)
 Put the lining panel (5) in position. Install the screws (4) and tighten the screws (4) and the fasteners (6).


 Subtask 23-71-14-865-052
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2RK, 4RK
 Subtask 23-71-14-710-051
 C. Do the operational test of the cockpit voice recorder system (Ref. TASK 23-71-00-710-001).
 5. Close-up
________ Subtask 23-71-14-860-050
 A. Make sure that the work area is clean and clear of tool(s) and other items.
 1EFF : ALL 1 23-71-14Page 405 1 1 Feb 01/98 1 1 1CES 1 RECORDER - COCKPIT VOICE (CVR) (1RK) - REMOVAL/INSTALLATION


___________________________________________________________
 TASK 23-71-35-000-001
 Removal of the Cockpit Voice Recorder (CVR) 1RK
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
 YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.4 m (11 ft. 2 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-213,
 23-71-35-991-001 Fig. 401 R **ON A/C 106-149, 214-299, 301-399, 401-499,
 23-71-35-991-001-A Fig. 401A
 1EFF : ALL 1 23-71-35Page 401 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL


 3. Job Set-up
__________
 NOTE : The procedure is valid for the Cockpit Voice Recorder (CVR) and Solid

____
 State Cockpit Voice Recorder (SSCVR).

 Subtask 23-71-35-865-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯3(28)