-the power-up test of the FMGC 1(2) starts.
-at the end of this test, the triple click aural warning sounds. On the carry-on loader the PROG indicator light comes on.
-When all the data are put into the computer (a time duration of 25 minutes can be necessary), the RDY and PROG indicator lights go off and the COMP indicator light comes on.
The MCDU MENU page comes into view.
An FM page comes into view.
The DATA INDEX page comes into view.
The A/C STATUS page comes into view.
R **ON A/C 001-049, 051-061, 101-105,
Subtask 22-70-00-710-062
B. On the center pedestal, on the A/C STATUS page of the MCDU1(2) do a check of:
-the active data base of the FMGC, in which you put the data, for correct dates and serial numbers shown (it is necessary to open the circuit breaker of the opposite FMGC).
5. Close-up
________
Subtask 22-70-00-865-112
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU COM NAV/ACARS/MU 2RB L06
Subtask 22-70-00-862-077
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R **ON A/C 106-149, 151-199, 201-299, 301-399, 401-499,
TASK 22-70-00-610-008-A Upload the FM Data WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1. Reason for the Job
__________________
Upload the FM Data with the Multipurpose Disk Drive Unit (MDDU).
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
22-70-00-610-009 Crossload the FM Data 22-96-00-710-001 Operational Test of the AFS 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
3. Job Set-up
__________
Subtask 22-70-00-861-071
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 22-70-00-860-109
B. Make sure that the aircraft is in the ground configuration.
Subtask 22-70-00-865-116
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AUTO FLT/FMGC/1 10CA1 B02 49VU AUTO FLT/MCDU/1 11CA1 B01 49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU DATA/LOADER/SPLY 3TD J16 121VU DLS&/DLRB/SPLY 5TD J15 121VU AUTO FLT/FMGC/2 10CA2 M17 121VU AUTO FLT/MCDU/2 11CA2 N20
R **ON A/C 106-149, 151-199, 211-299, 301-399, 401-499,
Post SB 22-1089 For A/C 151-199,211-212,
Subtask 22-70-00-280-068
D. Check of the P/N reference of the element(s) (pre-loaded in the related FMGC) on the applicable P/N STATUS page(s) on the MCDU (use the line select key to the NEXT PAGE or PREV PAGE indication).
NOTE : You must do this check because if the elements that you can load
____ are not correct, the FMGC will not accept the loading. On the applicable P/N STATUS page, make sure that these elements are in the FMGC:
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AUTO FLIGHT 自动飞行3(3)