• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2010-05-22 22:34来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

blue",ensure that the take-off or landing memo is displayed by reference to the memo title i.e.
T.O or LDG.
Some warnings and cautions are suppressed at critical phases of flight, however failures
critical a particular phase of flight will always be displayed. Note that these flight phases are
different from the flight phases used by the FMGS. On the SD some pages are
phase-selected i.e. the WHEEL page is automatically displayed after engine start. The cruise
page is not selectable, but is continuously displayed from 1500 ft after take-off to landing
gear extension unless a warning/caution is displayed, or a system page has been manually
selected.(FCOM 1.31.20 [Indicating/ Recording Systems - Indications on SD])
There are three levels of warning/caution, Levels 3, 2 and 1 with level 3 being the highest
(FCOM 1.31.10 (Indicating/Recording Systems - ECAM Description)). Level 3 is associated
with a master warning and is displayed in red on the E/WD. Level 2 is associated with a
master caution and is displayed in amber on the E/WD. Level 1 is displayed in amber on the
E/WD, however there is no master caution associated with Level 1.
In addition to the three levels of warning/caution, ECAM also differentiates between
Independent Failures, Primary Failures and Secondary Failures as follows:
A319/A320/A321
FLIGHT CREW TRAINING MANUAL
1.03.31 Page 2
REV 21 MAY 98
ABNORMAL OPERATION BRIEFINGS
ECAM
CHAP03\31
PHILOSOPHY AND NORMAL USE (END)
05 - TRAINEES’ ACTIONS (END)
INDEPENDENT FAILURES
A failure that does not affect other systems. The system title is underlined on the E/WD.
PRIMARY FAILURE
A failure that affects other systems and causes secondary failures. The failure title is boxed
on the E/WD.
SECONDARY FAILURE
A failure that is caused by a primary failure and not unserviceability of that particular system.
Secondary failures are in amber preceded by an asterisk on the bottom right hand side of the
E/WD.
In the event of multiple failures there is a hierarchy which determines which failures are
displayed on the E/WD i.e. level 3 takes priority over level 2. Furthermore there is a
hierarchy within each of the three levels to ensure that the most important failures are
displayed to the pilots first. Details of how failures are dealt with are given in the following
briefing note.
All screens are identical, providing the option of multiple redundancy, and simple switching.
The various options to allow switching of screens in the event of screen failure are detailed in
FCOM 1.31.05 (Indicating/Recording Systems - EIS General). ECAM failure modes are also
dealt with in the following briefing note.
The ECAM control panel is described in FCOM 1.31.30 (Indicating/Recording Systems -
ECAM Controls), however the operational use of the RCL and EMER CANC pb’s requires a
little explanation. The EMER CANC pb may be used by the crew to cancel any cautions or
warnings that are spurious or intermittent, and are effectively nuisance warnings. The RCL
pb is used to either recover cancelled cautions suppressed by the EMER CANC pb or, to
review cautions or warnings which have been cleared using the CLR pb.
06 - COMPLETION STANDARDS
· Knowledge and correct use of the ECAM system.
07 - COMMON ERRORS
· No deselection of manually selected system page.
· Landing "no blue" call made before landing memo displayed.
· Memo display not included in normal instrument scan.
A319/A320/A321
FLIGHT CREW TRAINING MANUAL
1.03.31 Page 3
REV 21 MAY 98
ABNORMAL OPERATION BRIEFINGS
ECAM
CHAP03\31
USE IN CASE OF FAILURES
01 - TRAINING OBJECTIVE
· To use ECAM procedures effectively and correctly.
02 - SCHEDULE
Briefing duration : 15 minutes
03 - EQUIPMENT
DOC references :
· QRH 0.00 (Task sharing)
· FCOM 1.24.10 & 20 (Electrical)
· FCOM 1.31.10 to 1.31.30 (ECAM Description)
· FCOM 3.02.01 (Procedure)
04 - INSTRUCTOR’S ACTIONS
Briefing of the following key points.
MAIN
· Task sharing.
· Identification of the failure.
· Co-ordinated ECAM actions and application of procedures.
SECONDARY
· Advisory information.
· Flight phase inhibition.
· Priority of warnings.
· Abnormal ECAM configurations.
· OEBs application.
A319/A320/A321
FLIGHT CREW TRAINING MANUAL
1.03.31 Page 4
REV 21 MAY 98
ABNORMAL OPERATION BRIEFINGS
ECAM
CHAP03\31
USE IN CASE OF FAILURES (CONT’D)
05 - TRAINEES’ ACTIONS
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Airbus.Flight.Crew.Training.Manual空客机组训练手册1(58)