• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 > EASA >

时间:2011-10-22 14:25来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

CAT.OP.MPA.170 Passenger briefing
The operator shall ensure that passengers are:
(a)  
given briefings and demonstrations relating to safety in a form that facilitates the application of the procedures applicable in the event of an emergency; and

(b)  
provided with a safety briefing card on which picture-type instructions indicate the operation of emergency equipment and exits likely to be used by passengers.

 

CAT.OP.MPA.175 Flight preparation
(a)  
An operational flight plan shall be completed for each intended flight based on considerations of aircraft performance, other operating limitations and relevant expected conditions on the route to be followed and at the aerodromes/operating sites concerned.

(b)  
The flight shall not be commenced unless the commander is satisfied that:

(1)  
all items stipulated in 2.a.3 of Annex IV to Regulation (EC) No 216/2008 concerning the airworthiness and registration of the aircraft, instrument and equipment, mass and centre of gravity (CG) location, baggage and cargo and aircraft operating limitations can be complied with; 

(2)  
the aircraft is not operated contrary to the provisions of the configuration deviation list (CDL);

(3)  
the parts of the operations manual that are required for the conduct of the flight are available;

(4)  
the documents, additional information and forms required to be available by CAT.GEN.MPA.180 are on board;

(5)  
current maps, charts and associated documentation or equivalent data are available to cover the intended operation of the aircraft including any diversion that may reasonably be expected;

(6)  
ground facilities and services required for the planned flight are available and adequate;

(7)  
the provisions specified in the operations manual in respect of fuel, oil, oxygen, minimum safe altitudes, aerodrome operating minima and availability of alternate aerodromes, where required, can be complied with for the planned flight; and

(8)  
any additional operational limitation can be complied with.

 

(c)  
Notwithstanding (a), an operational flight plan is not required for operations under VFR of:

(1)  
other-than-complex motor-powered aeroplane taking off and landing at the same aerodrome or operating site; or 

(2)  
helicopters with an MCTOM of 3 175 kg or less, by day and over routes navigated by reference to visual landmarks in a local area as specified in the operations manual.

 

 

CAT.OP.MPA.180 Selection of aerodromes — aeroplanes
(a)  Where it is not possible to use the departure aerodrome as a take-off alternate aerodrome due to meteorological or performance reasons, the operator shall select another adequate take-off alternate aerodrome that is no further from the departure aerodrome than:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Annexes to the draft Commission Regulation on ‘Air Operations - OPS’(83)