• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-21 07:59来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 25-31-04
 ALL  ú ú 08 Page 402 ú Dec 15/86
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 S 014-008
 (7)  
Remove the access plates in the galley ceiling.

 S 034-009

 (8)
Disconnect the electrical connectors above the galley.

 S 034-010

 (9)  
Disconnect the wires from the terminal board.

 S 034-082

 (10)
 Remove the counter top.

 S 024-090

 (11)
 Disconnect the overhead tie-rods from the galley.

 S 024-091

 (12)
 Disconnect the side tie-rods from the galley.

 S 024-014

 (13)
 Remove the higher galley part from the lower part.

 S 024-083

 (14)
 Remove the bolts, cylindrical nuts, and retainers from the floor attach fittings.

 S 024-016

 (15)
 Remove the lower galley part.


 TASK 25-31-04-404-017
 3.  Install Galley 4B (Fig. 401)_________________
 A. Consumable Materials
 (1)  
A00027 Adhesive - BAC5010 Type 60, RTV 174

 (2)  
G50019 Tape - Flexible foam, sound damping and sealant 1.00 inch wide by 0.25 inch, BMS 8-283, Type 1


 B. References
 (1)  AMM 33-51-01/201, Exit signs
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-04
 ALL  ú ú 09 Page 403 ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (2)  AMM 38-10-00/201, Potable Water System
 C. Access
 (1)  Location Zones
 251/252 Passenger Cabin - Section 46

 D. Procedure - Install Galley 4B
 S 424-087
 (1)  
Assemble the lower galley parts.

 S 434-020

 (2)  
Install the galley floor seals with type 60 adhesive. Apply the sealant to all the floor attach fittings.

 S 434-021

 (3)  
Install the pressure sensitive tape along the top of the gutter and on the outer surface of the adjacent side wall seals.

 S 424-086

 (4)  
Put the lower galley into position for installation.

 S 424-084

 (5)  
Install the bolts, cylindrical nuts, and retainers to the floor attach fittings.

 S 424-085

 (6)  
Put the higher galley part on the lower galley.

 S 424-088

 (7)  
Connect the overhead tie-rods to the galley.

 S 424-089

 (8)  
Connect the side ties.

 (9)  
Connect the wires to the terminal board.

 (10)
 Connect the electrical connectors above the galley.


 S 434-027
 S 434-028
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-04
 ALL  ú ú 09 Page 404 ú Jan 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 S 434-099
 (11)
 Install the access plates in the galley ceiling.

 S 434-029

 (12)
 Install the water lines.

 S 434-030

 (13)
 Connect the water supply line and the water drain line.

 S 434-092

 (14)
 Install the counter top.

 S 434-093

 (15)
 Install the sidewall and ceiling seals.

 S 434-033

 (16)
 Install the trim panels and trim flanges.

 S 394-034

 (17)
 Seal the galley structure with type 60 adhesive.

 S 434-094

 (18)
 Install the galley carts, containers, and ovens.

 S 434-095

 (19)
 Install the aft exit signs (Ref 33-51-01).

 S 864-096

 (20)
 Close the fill/overflow valve on the potable water service panel (Ref 38-10-00).

 S 864-037

 (21)
 Remove the DO-NOT-CLOSE tag and close the applicable circuit breaker on the P11 panel:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(5)