• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-21 07:59来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (d)  
11S30, LAV FLUSH MOTOR D

 


 S 864-055
 (5)  Remove the DO-NOT-CLOSE tags and close these circuit breakers on the P34 panel:
 (a)  
34B6, LIGHTS SERVICE LAV

 (b)  
34D1, LAV LIGHTS OCCUPY DOME

 (c)  
34D2, LAV LIGHTS THSHD


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-41-03
 ALL  ú ú 10 Page 409 ú Sep 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 S 864-056
 (6)  Remove the DO-NOT-CLOSE tags and close these circuit breakers on the P37 panel: (a) 37F1, HEATERS LAV WATER C (b) 37F2, HEATERS LAV WATER D (c) 37G3, LIGHTS LAV
 S 864-009
 (7)  Remove the DO-NOT-CLOSE tags and close these circuit breakers on the P70 panel: (a) 70A2, LAV WTR HTR T (b) 70A7, SHAVER LAV
 S 864-023
 (8)  ON GUN 206; Remove the DO-NOT-CLOSE tag and close this circuit breaker on the P70 panel: (a) 70A8, S LAV WTR HTR
 S 704-011
 (9)  Do a check on the lavatory lights, flush mechanism, and sink for correct operation.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-41-03
 ALL  ú ú 09 Page 410 ú Sep 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

1.


2.

3.


757 MAINTENANCE MANUAL
 CARGO COMPARTMENTS - DESCRIPTION AND OPERATION
______________________________________________
General (Fig. 1)
_______
 A.  The lower deck has a forward cargo compartment and an aft cargo compartment.
 B.  The forward and aft cargo compartment contain a sliding carpet loading system.
 C.  AIRPLANES WITH THE CARGO LOADER SYSTEM; The cargo loader system is installed in the cargo compartment.
 D.  The forward compartment has a capacity of 19.82 cubic meters. The aft compartment has a capacity of 30.86 cubic meters.
 E.  The cargo loader in the forward cargo compartment has a capacity of 15.57 cubic meters. There are 2.30 cubic meters more in the forward cargo compartment for cargo that is not on the cargo loader.
 F.  The cargo loader in the aft cargo compartment has a capacity of 11.33 cubic meters. These are 18.40 cubic meters more in the aft cargo compartment for the cargo that is not on the cargo loader.
 G.  For more data about the cargo loader system refer to AMM 25-51-00, Cargo
 Loader System - Description and Operation.Cargo Compartment Lining (Fig. 1)
________________________
 A.  The cargo compartments have linings to prevent damage to the structure. The lining panels also give a smooth surface which will not cause damage to the cargo.
 B.  The other function of the lining is to keep the fire extinguishing agent in the cargo compartment.
 C.  The floor lining panels are made of aluminum or fiberglass. They are sealed to prevent leaks.
 D.  The ceiling and sidewall panels in the aft compartment are made of fiberglass that have a tedlar face.
 E.  The panels in the forward cargo compartment, but not those that are near the door, are made of the same material as the panels in the aft compartment.
 F.  The ceiling panels that are near the doorway in the forward compartment are made of a rigid nomex honeycomb with a fiberglass face. These panels prevent damage to the wires and equipment.
 G.  The forward and aft bulkheads in each compartment are made of nomex honeycomb with a fiberglass face.
 H.  The aft bulkhead in the aft compartment has a zipper to get access aft of
 the bulkhead.Cargo Net Tiedown Fittings (Fig. 1)
__________________________
 A.  Tiedown fittings for the bulk cargo nets are in each compartment. The net tiedowns use standard fittings.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-50-00
 ALL  ú ú 11 Page 1 ú Jan 20/98
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(15)