• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-21 07:59来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 25-31-03
 ALL  ú ú 09 Page 401 ú Mar 20/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 757 MAINTENANCE MANUAL
SEE A
GALLEY 1A
ELCU (M546) SEEB
GALLEY 2B
ELCU (M10682)

GALLEY 4B ELCU (M227)
RIGHT GENERATOR POWER PANEL P32 A
LEFT GENERATOR POWER PANEL P31 B
Galley ELCU Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-03
 ALL  ú ú 09 Page 402 ú Jun 15/87
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 S 024-009
 (5)  Remove the ELCU.
 TASK 25-31-03-404-005
 3.  Install Galley ELCU (Fig. 401)___________________
 A. Access
 (1)  Location Zones
 211/212 Control Cabin - Section 41

 B. Procedure
 S 414-006
 (1)  
Put the ELCU into position for installation.

 S 424-011

 (2)
Install the mount bolts (for torque values Ref. 20-11-00).

 S 434-007

 (3)  
Connect the electrical connector (for torque values Ref. D6-54446).

 S 864-010

 (4)  
Remove the DO-NOT-CLOSE tags and close these circuit breakers on the P11 panel:

 (a)  
11S3, GALLEY G4B

 (b)  
ON GUN 206;
 11S33, GALLEY G1A


 (c)  
11S33, GALLEY CONT MID AFT

 (d)  
ON GUN 206;
 11S34, GALLEY G2B


 (e)  
11S34, GALLEY G1A

 


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-03
 ALL  ú ú 10 Page 403 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 AFT GALLEY - REMOVAL/INSTALLATION
_________________________________
 1.  General_______
 A. This procedure contains tasks to remove and install the aft galleys.
 TASK 25-31-04-004-018
 2.  Remove Galley 4B (Fig. 401)________________
 A. General
 (1)  You must divide the galley 4B into the higher and lower parts to remove the galley from the airplane. The lower part is divided into four smaller parts.
 B. References
 (1)  
33-51-01/201, Exit Signs

 (2)  
38-10-00/201, Potable Water System


 C. Access
 (1)  Location Zones
 251/252 Passenger Cabin - Section 46

 D. Procedure - Remove Galley 4B
 S 864-001
 (1)  Open the applicable circuit breaker on the overhead circuit breaker panel, P11, and attach a DO-NOT-CLOSE tag:
 (a)  11S3, GALLEY G4B
 S 034-081
 (2)  
Remove the aft exit signs before the removal of the galley (Ref 33-51-01).

 S 864-003

 (3)  
Open the fill/overflow valve on the potable water service panel to decrease the pressure of the water system (Ref 38-10-00).

 (4)  
Remove all the containers and carts from the galley.

 (5)
Disconnect the water supply line and the water drain line.

 (6)
Remove the water lines that are necessary to divide the galley.


 S 034-004
 S 034-005
 S 034-007
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 25-31-04
 ALL  ú ú 08 Page 401 ú Sep 20/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 757 MAINTENANCE MANUAL
GROUND
WIRE ELECTRICAL

A-A  B-B
Galley 4B Installation
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 EQUIPMENT/FURNISHINGS 2(4)