(3) Install the preformed hose (35) and the clamps (30) on the ECU and the ECU cooling duct.
(4) Install anti-ice duct (40) (Ref. TASK 30-21-51-400-042).
(5) Connect the electrical connector (4001VC-A) (45) for the interphone jack to the receptacle on the fan case. Tighten the connector with your hand.
5. Close-up
________ Subtask 71-11-00-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Close the fan cowl doors (Ref. TASK 71-13-00-410-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR
(3) Remove the access platform(s).
(4) Remove the warning notice(s). Subtask 71-11-00-820-051
B. Do the adjustment of the fan cowl doors (Ref. TASK 71-13-00-800-041).
F 『 EEFF : ALL E Page 41071-11-00
E E Nov 01/99 E E ECES E AIR INTAKE COWL - INSPECTION/CHECK
F 『
E C F M E
E E
E 56-5B E
E E
__________________________________
TASK 71-11-00-210-001
Visual Inspection of the Air Intake Cowl
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific warning notice
No specific access platform 1 m (3 ft. 3 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. CP2517 * aerodynamic tape (Ref. 70-30-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors SRM 541000 71-11-00-991-302 Fig. 601 71-11-00-991-303 Fig. 602 71-11-00-991-304 Fig. 603 71-11-00-991-305 Fig. 604
F 『 EEFF : ALL E Page 60171-11-00
E E Feb 01/98 E E ECES E 3. Job Set-up
F 『
E C F M E
E E
E 56-5B E
E E
__________ Subtask 71-11-00-941-053
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 71-11-00-010-052
B. Get Access
(1) Open the fan cowl doors (Ref. TASK 71-13-00-010-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR
(2) Put the access platform in position.
F 『 EEFF : ALL E Page 60271-11-00
E E Feb 01/98 E E ECES E 4. Procedure
F 『
E C F M E
E E
E 56-5B E
E E
_________ (Ref. Fig. 601/TASK 71-11-00-991-302, 602/TASK 71-11-00-991-303, 603/TASK 71-11-00-991-304, 604/TASK 71-11-00-991-305) Subtask 71-11-00-210-050
A. Do a Visual Inspection of the Intake Cowl Outer Barrel
-------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
1. Examine edge around
outer barrel skin 1.5
in. (38.1 mm) from
all edges and cutouts
A. Abrasion
R
R
R
R
R
R
B. Crack
C. Delamination