 (i) When the bolt holes are aligned, install the bolt (5), washers (10), (65) and nut (60).
 NOTE : Make sure that you put countersunk washers under the bolt
____
 head.

 (j) TORQUE the nut (60) to between 24 and 27 lbf.in (0.27 and 0.30 m.daN).

 (k) Apply sealant as follows
 (Ref. Fig. 402/TASK 71-21-11-991-301)
 (detail B):

 

 CAUTION : RTV-88 SEALANT IS CLASSIFIED AS A DANGEROUS MATERIAL
_______ WHICH CAN CAUSE INJURY OR ILLNESS IF IT IS NOT CORRECTLY USED. REFER TO THE MANUFACTURER'S SPECIFIC SAFETY AND HEALTH RECOMMENDATIONS BEFORE YOU USE THIS PRODUCT. CAREFULLY READ THE APPLICABLE "MATERIAL SAFETY DATA SHEET" AND OBEY ALL SAFETY AND HEALTH PRECAUTIONS.
 1 Fill the space between to the two retainers (15) and (70) with
_ sealant silicone sealant (RTV-88) (Material No. CP2541).
 2 Fill the space between the wings on the nut (50) and the
_ forward mount link with sealant (CP2541).
 3 Apply a bead of sealant (CP2541) around the head of the bolt
_
 (20).

 5. Close-up
________
 Subtask 71-21-11-080-050
 A. Remove the RODS - FWD ENG MOUNT (98D71203003000) from the engine.
 Subtask 71-21-11-410-059
 B. Close the thrust reverser cowl doors (Ref. TASK 78-36-00-410-040): FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR
 Subtask 71-21-11-440-052
 C. Make the thrust reverser serviceable (Ref. TASK 78-30-00-081-041).
 F 『 EEFF : ALL E Page 43171-21-11
 E E May 01/99 E E ECES E Subtask 71-21-11-410-060

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 D. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.

 (2) Close the fan cowl doors (Ref. TASK 71-13-00-410-040):
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR


 (3) Remove the warning notice(s).

 (4) On the panel 114VU remove the locking tool from the flap and slat control lever.


 F 『 EEFF : ALL E Page 43271-21-11
 E E May 01/99 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 MOUNT - FORWARD - INSPECTION/CHECK


__________________________________
 TASK 71-21-11-210-040
R Detailed Visual Inspection of the Forward Engine Mount with the Engine R Installed
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 712111-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
 No specific access platform 1 m (3 ft. 3 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 71-21-11-000-041 Removal of the Forward Engine Mount 71-21-11-000-045 Removal of the Forward Engine Mount Bolts One at a
 Time 71-21-11-400-041 Installation of the Forward Engine Mount 71-21-11-400-045 Installation of the Forward Engine Mount Bolts One at
 a Time
 78-30-00-081-041 Make the Thrust Reverser Serviceable after
 Maintenance
 78-30-00-481-041 Make the Thrust Reverser Unserviceable for

 Maintenance
 78-36-00-010-040 Opening of the Thrust Reverser Doors
 78-36-00-410-040 Closing of the Thrust Reverser Doors
 CMM 712108

R 71-21-11-991-302 Fig. 601 71-21-11-991-305 Fig. 602 71-21-11-991-306 Fig. 603
 F 『 EEFF : ALL E Page 60171-21-11
 E E May 01/00 E E ECES E -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


71-21-11-991-307 Fig. 604
 3. Job Set-up
__________ Subtask 71-21-11-941-056
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
 