 11.25 degrees for the upper lug.
 The aft mount consists of :

 - 3 fail-safe links.
 Each link is a triple element stacked assembly. These elements are connected
 by two attachments.
 The lower attachment of each link has a bearing. It provides attachment to
 the engine casing lugs :


 - a cross beam fitting.
 The cross beam has 3 lugs for attachment of the 3 links.
 Each lug includes a bearing.
 The cross beam has a mating face for connection with the engine pylon.
 This attachment is made through 4 tension bolts and 2 shear pins.
 One of the two shear pins is a back-up pin also used as an alignment pin.
 The cross beam fitting is a fail-safe design : it consists of two lateral
 parts linked by shear pins.

 

 2. Material
________ The aft mount beam is machined from an Inconel 718 forging. The three links are machined from Inconel 718.
 F 『 EEFF : ALL E Page 171-22-00
 E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E

 

 Aft Engine Mount
 Figure 001

 F 『 EEFF : ALL E Page 271-22-00
 E E Feb 01/98 E E ECES E MOUNT - AFT - REMOVAL/INSTALLATION

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


__________________________________
 TASK 71-22-11-000-041
 Removal of the Aft Engine Mount
 1. Reason for the Job

__________________
 Self Explanatory


 2. Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
RSE1224 2 SPLINT - ENGINE MOUNT AFT
 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
No specific TY WRAP
 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
71-00-00-000-042 Removal of the Power Plant
 71-22-11-991-300 Fig. 401

 3. Job Set-up
__________
 Subtask 71-22-11-010-050

 A. Remove the engine (Ref. TASK 71-00-00-000-042).
 F 『 EEFF : ALL E Page 40171-22-11
 E E Feb 01/98 E E ECES E E 56-5B E

 F  『
 E  C F M  E
 E  E


 E E

 4. Procedure


 