 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) 98F10103500000 1 CHOCK - MLG, ENGINE RUN-UP
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-13-79-610-002 Check oil level and replenish Check Pop Out Indicator
 of EMCD (Electrical Master Chip Detector) 12-13-79-610-002 Check oil level and replenish (Pressure Filling) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 26-12-00-710-001 Operational Check of Loop/Squib 29-10-00-863-002 Pressurize the Yellow Hydraulic System 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 36-12-00-860-001 Pressurization of the Bleed System with the APU 36-12-00-860-002 Pressurization of the Bleed System through the HP
 Ground Connector 71-00-00-710-028 Engine Shutdown 71-00-00-790-002 Fuel or Hydraulic or Oil Leakage Limits 71-00-00-869-003 Wind Limitations During Engine Ground Operations 71-00-00-869-004 Safety Precautions During Engine Ground Operations
 F 『 EEFF : ALL E Page 54171-00-00
 E E May 01/04 ERE
ECES E 3. Job Set-up

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


__________
 Subtask 71-00-00-869-095
 A. Preparation for Test
 NOTE : If a Post Flight Report (PFR) is necessary after the ground run,
____ enter a new flight number thru the MCDU (at least one dummy character is sufficient)
 (1) Obey the wind limitations and (Ref. TASK 71-00-00-869-004) during engine ground operations (Ref. TASK 71-00-00-869-003).

 (2) Put the CHOCK - MLG, ENGINE RUN-UP (98F10103500000) in position.

 (3) Make sure that the engine inlet and exhaust covers are removed. Make sure that these areas are clear of unwanted objects.

 (4) Make a visual check of the temperature sensors, fan inlet, and exhaust areas. If snow or ice has collected in the fan duct, make sure that the fan turns freely. Also, make sure that the engine inlet, inlet lip, fan, spinner, and fan exhaust duct are clear of ice or snow. If the fan does not turn freely, melt the ice or snow with hot air before an engine operation.

 (5) Look at the general condition of the fan spinner and fan blades, core exhaust nozzle, LPT and external surfaces of the cowls.

 (6) Make a check of the drain ports for fuel, oil and hydraulic leaks (Ref. TASK 71-00-00-790-002). Also make sure that fuel drained from the engine does not cause a fire.


 NOTE : In case of extreme cold weather condition (OAT < -20 deg.C),
____ fuel leaks from the drain may occur and should not be considered as abnormal. Therefore, check for fuel leaks at the drain mast shall be performed with the engine fully stabilized at idle.
 Subtask 71-00-00-861-060
 B. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 F 『 EEFF : ALL E Page 54271-00-00
 E E May 01/04 ERE
ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 Subtask 71-00-00-865-064

 C. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------
PANEL DESIGNATION  IDENT. LOCATION
 -------------------------------------------------------------------------------
49VU ENGINE/1 AND 2/IGN/SYS A 1JH A03 FOR 1000EM1
 49VU ENGINE/1/FADEC A/AND EIU 1 2KS1 A04 121VU ENGINE/ENG1/OIL/PRESS 2EN1 N40 121VU ENGINE/ENG1/OIL/QTY 1EN1 N39 121VU ENGINE/IGN/ENG1/SYS B 3JH1 P41 121VU ENGINE/IGN/ENG1/SYS A BAT 2JH1 P39 121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
 FOR 1000EM2
 49VU ENGINE/2/FADEC A/AND EIU 2 2KS2 A05 121VU ENGINE/ENG2/OIL/PRESS 2EN2 N42 121VU ENGINE/ENG2/OIL/QTY 1EN2 N41 121VU ENGINE/IGN/ENG2/SYS B 3JH2 P42 121VU ENGINE/IGN/ENG2/SYS A BAT 2JH2 P40 121VU ENGINE/ENG2/FADEC B 4KS2 Q40
 Subtask 71-00-00-865-065
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU ANTI ICE/PROBES/AOA/1 4DA1 D04 49VU ANTI ICE/PROBES/PHC/1 2DA1 D03 49VU ANTI ICE/PROBES/PITOT/1 3DA1 D02
 