E 56-5B E
E E
TASK 71-11-00-220-001
Detailed Visual Inspection of the Inlet Cowl Forward Backskin through the
Anti-ice Vent Panel
1. Reason for the Job
__________________
Refer to the MPD TASK: 711000-C4
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice
No specific 1 ACCESS PLATFORM 1M (3 FT)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors
71-13-00-410-040 Closing of the Fan Cowl Doors
CMM 711119
RA 32071-108
SRM 541000
71-11-00-991-306 Fig. 605
3. Job Set-up
__________
Subtask 71-11-00-941-063
A. Safety Precautions
(1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
F 『 EEFF : ALL E Page 62571-11-00
E E May 01/05 ERE ECES E
F 『
E C F M E
E E
E 56-5B E
E E
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 71-11-00-010-062
B. Get Access
(1) Open the fan cowl doors (Ref. TASK 71-13-00-010-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR.
(2) Put the ACCESS PLATFORM 1M (3 FT) in position.
(3) Remove the screws (5) and (10) that attach the anti-ice vent panel to the inlet cowl outer barrel.
(4) Remove the anti-ice vent panel (10).
4. Procedure
_________
Subtask 71-11-00-220-052
A. Do a detailed visual inspection of the inlet cowl inner barrel forward backskin, that you can see through the anti-ice vent opening, using a flashlight and an inspection mirror: (Ref. Fig. 605/TASK 71-11-00-991-306)
-------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
1. Corrosion/Disbond Not permitted opposite (Ref. SRM 541000), disbond on opposite face (Ref. CMM 711119), sheet. (Ref. RA 32071-108). Maximum depth 0.63 mm (0.0248 in.). Maximum dimension 55.9 mm (2.2007 in.). Areas of corrosion/disbond must be separated from other
F 『 EEFF : ALL E Page 62671-11-00
E E May 01/05 ERE
ECES E
F 『
E C F M E
E E
E 56-5B E
E E
-------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
areas of
corrosion/disbond by 198
mm (7.7952 in.).
Multiple damage sites
exceeding a total of
55.9 mm (2.2007 in.) in any 254 mm (10.0000 in.) should be repaired.
5. Close-up
________
Subtask 71-11-00-410-060
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Install the screws (5) and (10) that attach the anti-ice vent panel to the inlet cowl outer barrel.
(3) Close the fan cowl doors (Ref. TASK 71-13-00-410-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR.
(4) Remove the access platform(s).
(5) Remove the warning notice(s).
F 『 EEFF : ALL E Page 62771-11-00
E E May 01/05 E E ECES E F 『 E C F M E E E E 56-5B E F 『 E C F M E E E E 56-5B E
Air Intake Cowl
Figure 605/TASK 71-11-00-991-306- 12 (SHEET 1)
F EEFF : ALL 『E 71-11-00 Page 628
E E May 01/05
E E
ECES E
Air Intake Cowl
Figure 605/TASK 71-11-00-991-306- 22 (SHEET 2)
F EEFF : ALL 『E 71-11-00 Page 629
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 动力装置 POWER PLANT 1(100)