R -20.7
R - EGT margin at 5000 feet = 44 - 20.7 = 23.3 deg C

 F 『R EEFF : ALL E Page 58271-00-00
 E E Aug 01/05 E E ECES E F 『R EEFF : ALL E Page 58371-00-00

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E 


R  (a) If the adjusted values for EGT and N2 are less than the maximum 
R  limits (if EGT and N2 margin are positive numbers), the engine 
R  will make target N1 and not be more than the EGT or N2 limits. No 
R  more power assurance testing is necessary if this occurs. 
R  (b) If the data is not in line with limits, let the engine become 
R  stable at idle for 4 minutes and do the power assurance again at 
R  the same power level. 
R  (c) If the data is still not in line with the limits after a second 
R  engine run, investigate the reported fault messages in the 
R  Trouble Shooting Manual. 
R  CAUTION : IF THE DATA COLLECTED IS NOT IN LINE WITH THE PERMITTED_______ 
R  LIMITS, THE ENGINE MAY GO OVER THE EGT OR N2 LIMIT AT 
R  TAKEOFF POWER. 
R  (d) If the cause is found and corrected, do the power assurance check 
R  again. 
R  (e) If the engine exceeds EGT or N2 limits in normal operation after 
R  two test runs and after troubleshooting per the TSM has been 
R  completed, engine replacement should be considered. The power 
R  assurance check should not be used by itself as a primary reason 
R  for engine replacement. 
R  (10) Stop the engines (Ref. TASK 71-00-00-710-028). 
R  (11) Do a visual inspection of the engine, the engine inlet and exhaust 
R  areas. 
R
 5. Close-up________
 Subtask 71-00-00-869-106
 A. On the AIR COND panel 30VU:
 - Release the ENG 1(2) BLEED pushbutton switch (the OFF legend goes off).
 Subtask 71-00-00-862-063
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
002).

 E E Aug 01/05 E E ECES E TASK 71-00-00-710-009

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 Vibration Check
 1. Reason for the Job
__________________
 The vibration monitoring system can be used to get vibration data. This task should be performed when a new non pre-tested engine is installed or after FOD/ICING and subsequent fan blades change.
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 71-00-00-710-003 Engine Automatic Start 71-00-00-710-028 Engine Shutdown 77-32-34-860-041 Change the configuration of the Accelerometer TSM 77 PB 101 (for corrective action)
 3. Job Set-up
__________
 Subtask 71-00-00-869-204
 A. Safety Precautions
 CAUTION : DO NOT DO ENGINE GROUND RUNS UNLESS THE AIRCRAFT IS ON A
_______ CONCRETE PAVEMENT. ENGINE EXHAUST GASES CAN CAUSE AN ASPHALT PAVEMENT TO MELT. MELTED ASPHALT CAN CAUSE IMPORTANT DAMAGE TO THE REAR STRUCTURE OF THE AIRCRAFT AND/OR TO THE ENGINE NACELLES.
 (1) Make sure that the aircraft is parked on a clean dry flat area. There must be no oil, grease or other slippery material on that surface. Pavement must be in concrete because asphalt can cause damage to the engine/aircraft sturcture.
 F 『R EEFF : ALL E Page 58471-00-00
 E E Aug 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (2) Make sure that a total of 3000 Kg (minimum) of fuel are in the inner tanks.
 Subtask 71-00-00-861-064
 B. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 71-00-00-865-100
 C. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34
 