• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:31来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
 Power Supply 29-10-00-864-003 Depressurize the Blue Hydraulic System 29-22-00-869-002 Retraction of the Ram Air Turbine (RAT) on the Ground 31-60-00-860-001 EIS Start Procedure 31-60-00-860-002 EIS Stop Procedure 29-22-51-000-001 Removal of the Ram Air Turbine 2140GE (for corrective
 action)
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-00-00Page 253 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-22-51-400-001  Installation of the Ram Air Turbine 2140GE (for
 corrective action)

 29-22-52-000-001  Removal of the RAT Ground Check Module (2027GE) (for corrective action)
 29-22-52-400-001  Installation of the RAT Ground Check Module (2027GE) (for corrective action)
 3. Job Set-up
__________
 Subtask 29-00-00-860-084

 A. Aircraft Maintenance Configuration
 (1)
 Put the safety barriers in position adjacent to the location of the RAT (forward of the left main door of the main landing gear).

 (2)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).


 Subtask 29-00-00-010-065
 B. Get Access
 (1)
 Open the access door 197EB.
 Subtask 29-00-00-865-076


 C.
 Make sure that this(these) circuit breaker(s) is(are) closed:


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------106VU CSM/G /EV/MAN/SPLY 6XE B04 121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33

R **ON A/C 001-049, 051-061, 101-102, 201-202,
 121VU HYDRAULIC/RAT/CTL  2801GE P32
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-00-00Page 254 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------R **ON A/C 103-105, 203-203,
 121VU HYD/RAT/CTL 2801GE P32 R **ON A/C 001-049, 051-061, 101-105, 201-203,
 Subtask 29-00-00-865-077
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
105VU ELEC/CSM/G /EV AUTO/SPLY 7XE C01
 4. Procedure
_________
 Subtask 29-00-00-710-056

 A. Operational Test WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
 EXTEND/RETRACT THE RAT.

 NOTE : A second person must examines the extension of the RAT before you
____
 push the RAT MAN ON pushbutton.

 NOTE : Do not operate the RAT deployment solenoids for more than 60
____ seconds. You can operate them more than once during the test. When the total operation time (solenoid energized) is 60 seconds, you must let the solenoids cool for 30 minutes.
R 1EFF : 001-049, 051-061, 101-105, 201-203, 1 29-00-00Page 255 1 1 May 01/05 1 1 1CES 1 (1) Do this test


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the overhead panel 40VU: At the RAT:
 -lift the cover and push the RAT  - the RAT extends.
 MAN ON switch.

 2.
 Retract the RAT (Ref. TASK 29-22- - the RAT returns to its stowage. 00-869-002).

 3.
 On the overhead panel 21VU: At the RAT:


 -lift the cover and push the MAN  - the RAT extends.
 ON/AUTO switch in the EMER ELEC
 PWR section.

 Subtask 29-00-00-860-085
 B. Preparation for the Bleeding Procedure
 (1)
 Install the PROTECTION EQUIPMENT - RAT.

 (2)
 Connect the CONTROL UNIT - RAT (682003008) to the ground test connector of the RAT ground control panel 2815GE.

 (3)
 Pressurize the Blue hydraulic system with the ground power cart (Ref. TASK 29-10-00-863-003).


 NOTE : For the test of the function of the RAT-governor including the
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压1(62)