 Pressure Switches and Check of the
 Reservoir Air Pressure of the
 Green and Yellow Hydraulic System

 Refer to the MMEL TASK: 401  ALL
 29-30-04-B)
 Reactivation of the Reservoir Air 406 ALL
 Pressure Switches of the Green and
 Yellow Hydraulic System

 Refer to the MMEL TASK: 406  ALL
 29-30-04-B) Deactivation of the Reservoir Air 409 062-099, 106-149 Pressure Switch and Check of the 151-199, 204-299 Reservoir Air Pressure of the Blue 301-399, 401-499 Hydraulic System
 Refer to the MMEL TASK: 409 062-099, 106-149 29-30-04-B) 151-199, 204-299 301-399, 401-499 Reactivation of the Reservoir Air 413 062-099, 106-149 Pressure Switch of the Blue 151-199, 204-299 Hydraulic System 301-399, 401-499 Refer to the MMEL TASK: 413 062-099, 106-149 29-30-04-B) 151-199, 204-299 301-399, 401-499
 29-CONTENTS Page 41 Aug 01/05 R CES


 CHAPTER 29
__________
 HYDRAULIC POWER
 TABLE OF CONTENTS
_________________
 SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY________ C ____ ___________
 RESERVOIR PRESSURIZATION INDICATING 29-34-00
 ADJUSTMENT/TEST 501 ALL Operational Test of Reservoir Low 501 ALL Air Pressure Warning Operational Check of Reservoir Low 508 001-049, 051-061 Air Pressure Warning 101-105, 201-203
 PRESSURE SWITCH - RESERVOIR AIR 29-34-11
 REMOVAL/INSTALLATION 401 ALL
 Removal of the Reservoir Pressure 401 ALL
 Switch of the Green Hydraulic
 System
 Installation of the Reservoir 405 ALL
 Pressure Switch of the Green
 Hydraulic System
 Removal of the Reservoir Pressure 410 ALL
 Switch of the Blue Hydraulic
 System
 Installation of the Reservoir 413 ALL
 Pressure Switch of the Blue
 Hydraulic System
 Removal of the Reservoir Pressure 418 ALL
 Switch of the Yellow Hydraulic
 System
 Installation of the Reservoir 421 ALL
 Pressure Switch of the Yellow
 Hydraulic System

 PRESSURE SWITCH - AIR, BLUE RESERVOIR 29-34-13 REMOVAL/INSTALLATION 401 001-049, 051-061
 101-105, 201-203 Removal of the Air Pressure Switch 401 001-049, 051-061 (2387GH) 101-105, 201-203 Installation of the Air Pressure 404 001-049, 051-061 Switch (2387GH) 101-105, 201-203
 29-CONTENTS Page 42 May 01/05
 CES


R
R

R
R

R
R

HYDRAULIC POWER - GENERAL - DESCRIPTION AND OPERATION
_____________________________________________________
 1. General_______ (Ref. Fig. 001)
**ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
(Ref. Fig. 002)
**ON A/C 401-499,
(Ref. Fig. 002A)
**ON A/C ALL
 The aircraft has three main hydraulic systems. They are identified as the Green, Blue and Yellow systems. Together they supply hydraulic power at 3000 psi (206 bar) to the main power users. These include the flight controls, landing gear, cargo doors, brakes and thrust reversers. Services which are not used during flight (cargo doors, brakes, landing gear and nosewheel steering) are isolated from the main supply. (Ref. Fig. 003, 004)
 The three systems are not hydraulically connected. Where possible they are kept apart to keep to a minimum the effect of engine or tire burst, or other damage. There are no hydraulic pipes in the passenger cabin or flight compartment. (Ref. Fig. 005)
 High pressure (HP) pipes which are not in fire zones are made of titanium alloy and are not painted. HP pipes in fire zones are made of stainless steel. Low pressure (LP) pipes are made of light alloy and are painted for protection against corrosion. In certain special areas (landing gear bays), the LP pipes are made of stainless steel or titanium alloy. Stainless steel and titanium alloy pipes are electrically bonded with bonding leads and clips. It is not necessary to bond light alloy pipes. Flexible pipes are used where it is necessary because there is vibration or movement between components. (Ref. Fig. 006)
 Manifolds are used where possible in both the HP and LP systems. The maximum quantity of components are installed on the manifolds to prevent damage to or movement of the pipes when components are replaced. The manifolds have bobbin type connections for some components.

  1EFF : ALL  1 29-00-00Page 1 1 1 Aug 01/05 1 1 1CES 1


 Symbols
 Figure 001
 1EFF :  ALL  1  29-00-00 Page 2 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Hydraulic Power Users
 Figure 002

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 29-00-00Page 3 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
 