13.
Close the circuit breaker 1703GK (3702GD).
14.
Install the overhead panel 49VU.
R 1EFF : 106-149, 211-299, 301-399, 401-499, 1 29-10-00Page 516 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
5. Close-up
________ Subtask 29-10-00-860-075
A. Put the aircraft back to the serviceable condition.
(1)
On panel 402VU on the center pedestal, set the A/SKID NOSE WHEEL switch to on.
(2)
On the overhead panel 40VU, push and release the PTU/AUTO P/BSW. Make sure that the OFF and FAULT lights are not on.
(3)
Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002)
(4)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R 1EFF : ALL 1 29-10-00Page 517 1 1 May 01/05 1 1 1CES 1
INTENTIONALLY BLANK
R 1 1
29-10-00Page 518
1 1 May 01/05 1 1 1CES 1
TASK 29-10-00-720-002
R Functional Check of Priority Valves in Green, Blue and Yellow System R
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Refer to the MPD TASK: 291000-08
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 29-10-00-863-001 Pressurize the Green Hydraulic System 29-10-00-863-002 Pressurize the Yellow Hydraulic System 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
Power Supply 29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-10-00-864-003 Depressurize the Blue Hydraulic System 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 29-23-00-860-002 Connection of the Isolation Coupling of the Power Transfer Unit (PTU) 31-60-00-860-001 EIS Start Procedure
3. Job Set-up
__________
Subtask 29-10-00-860-076
A. Aircraft Maintenance Configuration
R (1) Make sure that the isolation coupling 3701GM of the power transfer R unit (PTU) is not disconnected (Ref. TASK 29-23-00-860-002).
(2)
Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
(3)
Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
(4)
On the ECAM control panel, push the HYD key. Make sure that the HYD page comes into view on the ECAM lower display unit (DU).
(5)
Make sure that the ECAM system shows none of these conditions:
-
low air pressure in the reservoirs of the Green, Blue or Yellow hydraulic systems,
-
low fluid contents in the reservoirs of the Green, Blue or Yellow hydraulic systems.
(6)
If necessary, pressurize the reservoir(s) (Ref. TASK 29-14-00-614-002).
(7)
If necessary, add fluid to the reservoir(s) (Ref. TASK 12-12-29-611-001) or (Ref. TASK 12-12-29-611-002) .
(8)
On the overhead panel 40VU, push and release the PTU P/BSW. Make sure that the OFF light comes on.
(9)
Connect a hydraulic ground supply to the connections on the ground
R service panel of the Green hydraulic system (Ref. TASK 29-10-00-863-001).
Subtask 29-10-00-865-063
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压1(115)