CHAPTER 29
__________
HYDRAULIC POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ GREEN MAIN HYDRAULIC POWER 29-11-00
DESCRIPTION AND OPERATION 1 ALL General 1 ALL Component Location 2 ALL System Description 16 ALL Power Supply 25 ALL Component Description 25 ALL Reservoir 1000GQ 25 ALL Engine Pump Fire Valve 1046GK 31 ALL Engine-Driven Pump 1030GK 33 ALL Manifolds 36 ALL System Accumulator 1070GM 37 ALL Nitrogen Pressure Gage 1072GM 39 ALL High Pressure (HP) Filter 1048GM 39 ALL Case Drain Filter 1084GM 41 ALL Low Pressure (LP) Filter 1002GM 41 ALL Relief Valve 1063GM 41 ALL Priority Valve 1064GM 41 ALL Sampling Valve 1187GM 45 ALL Check Valves 45 ALL Compensated Slide 1010GM 48 ALL Operation 50 ALL
GREEN MAIN HYDRAULIC POWER 29-11-00
ADJUSTMENT/TEST 501 ALL Operational Test of the Green 501 ALL Hydraulic System
MANIFOLD - MAIN HP 29-11-14
REMOVAL/INSTALLATION 401 ALL Removal of the HP Manifold of the 401 ALL Green Hydraulic System Installation of the HP Manifold of 407 ALL the Green Hydraulic System
MANIFOLD - PTU 29-11-15
REMOVAL/INSTALLATION 401 ALL Removal of the Power Transfer Unit 401 ALL (PTU) Manifold of the Green Hydraulic System Installation of the Power Transfer 408 ALL Unit (PTU) Manifold of the Green Hydraulic System
PRESSURE SWITCH - ENGINE PUMP 29-11-17
REMOVAL/INSTALLATION 401 ALL Removal of the Engine-Pump 401 ALL Pressure Switch (1074GK)
29-CONTENTS Page 5 Aug 01/05 R CES
CHAPTER 29
__________
HYDRAULIC POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Installation of the Engine-Pump 407 ALL Pressure Switch (1074GK)
PRESSURE GAGE - ACCUMULATOR AIR, GREEN 29-11-21
POWER
REMOVAL/INSTALLATION 401 ALL Removal of the Accumulator-Air 401 ALL Pressure Gage (1072GM) Installation of the 406 ALL Accumulator-Air Pressure Gage (1072GM)
VALVE - CHARGING, GREEN POWER 29-11-22
ACCUMULATOR
REMOVAL/INSTALLATION 401 ALL Removal of the Accumulator-Gas 401 ALL Charging Valve (1071GM) Installation of the 406 ALL Accumulator-Gas Charging Valve (1071GM)
RELIEF VALVE 29-11-32
REMOVAL/INSTALLATION 401 ALL Removal of the Pressure Relief 401 ALL Valve of the Green Hydraulic System (1063GM) Installation of the Pressure 407 ALL Relief Valve of the Green Hydraulic System (1063GM)
PRIORITY VALVE 29-11-33
REMOVAL/INSTALLATION 401 ALL Removal of the Priority Valve of 401 ALL the Green Hydraulic System (1064GM) Installation of the Priority Valve 406 ALL of the Green Hydraulic System (1064GM)
VALVE - FLUID SAMPLING 29-11-34
REMOVAL/INSTALLATION 401 ALL Removal of the Fluid Sampling 401 ALL Valve of the Green Hydraulic System (1187GM) Installation of the Fluid Sampling 406 ALL Valve of the Green Hydraulic System (1187GM)
CHECK VALVE - ENGINE 1 THRUST REVERSER 29-11-35
REMOVAL/INSTALLATION 401 ALL Removal of the Engine 1 Thrust 401 ALL Reverser Check Valve (3010KM1)
29-CONTENTS Page 6 May 01/05 R CES
CHAPTER 29
__________
HYDRAULIC POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Installation of the Engine 1 405 ALL Thrust Reverser Check Valve (3010KM1)
CHECK VALVE - ENG 1 PUMP DELIVERY 29-11-36
REMOVAL/INSTALLATION 401 ALL Removal of the Engine 1 Green 401 ALL Hydraulic Pump Delivery Check Valve (1050GM). Installation of the Engine 1 Green 405 ALL Hydraulic Pump Delivery Check Valve (1050GM).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压1(28)