• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:31来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific FLOWMETER 20 L.MN (5.2833 US GAL.MN), calibrated to R +/- 1.5% over full range
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-280-001 Check of the Internal Leakage of the Green Hydraulic System 29-00-00-280-003 Check of the Internal Leakage of the Yellow Hydraulic System 29-00-00-280-004 Check of the Internal Leakage of the Power Transfer
 Unit (PTU)
 29-10-00-863-001 Pressurize the Green Hydraulic System
 29-10-00-863-002 Pressurize the Yellow Hydraulic System
 29-10-00-864-001 Depressurize the Green Hydraulic System
 29-10-00-864-002 Depressurize the Yellow Hydraulic System

 

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-23-00-860-001 29-23-00-860-002  Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
 3. Job Set-up__________
 Subtask 29-10-00-860-066
 A. Aircraft Maintenance Configuration
 (1) Make sure that the aircraft is in this configuration: - the spoilers 1 thru 5 retracted, - all servo controls in their neutral positions.
 (2) Disconnect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-001).
 4. Procedure_________
 Subtask 29-10-00-220-050
 A. Do this Functional Test for the Green Hydraulic System 
R R R  (1) Use a ground service cart with a FLOWMETER 20 L.MN (5.2833 US GAL.MN), calibrated to +/- 1.5% over full range to pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001).
 (2) Make a record of the flow rate. 
R  (3) Make sure that the flow rate is not more than 9 l (2.3775 USgal)/minute.
 (4) If the flow rate is too high, do the full check of internal leakage to find the cause (Ref. TASK 29-00-00-280-001) (Ref. TASK 29-00-00-280-004).
 (5) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001).

 

 Subtask 29-10-00-220-052
 B. Do this Functional Test for the Yellow Hydraulic System 
R R R  (1) Use a ground service cart with a FLOWMETER 20 L.MN (5.2833 US GAL.MN), calibrated to +/- 1.5% over full range to pressurize the Yellow hydraulic system (Ref. TASK 29-10-00-863-002).
 (2) Make a record of the flow rate. 
R  (3) Make sure that the flow rate is not more than 10 l (2.6416 USgal)/minute.
 (4) If the flow rate is too high, do the full check of internal leakage to find the cause (Ref. TASK 29-00-00-280-003) (Ref. TASK 29-00-00-280-004).
 (5) Depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-002).
 5. Close-up________
 Subtask 29-10-00-860-067
 A. Put the aircraft back to the serviceable condition.
 (1) Remove the ground service cart and the flow meter from the aircraft.
 (2) Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. TASK 29-23-00-860-002).

 

 TASK 29-10-00-220-002
 Functional Check to Monitor Internal Leak Rate of Blue Hydraulic System
 WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING

_______
 NOTICES ARE IN POSITION.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: 291900-02


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific FLOWMETER 20 L.MN (5.2833 US GAL.MN), calibrated to R +/- 1.5% over full range
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-280-002  Check of the Internal Leakage of the Blue Hydraulic System 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground Power Supply 29-10-00-864-003 Depressurize the Blue Hydraulic System
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压1(122)