TASK 29-00-00-870-005
Bleeding Procedure of the Yellow Hydraulic System Upstream of the PTU
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR.
_______ MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE.
1. Reason for the Job
__________________
Do this procedure after maintenance of the Yellow hydraulic system upstream of the PTU.
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector 32-12-00-010-001 Open the Main Gear Doors for Access 32-12-00-410-001 Close the Main Gear Doors after Access
1EFF : ALL 1 29-00-00Page 224 1 1 Feb 01/01R 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R 29-00-00-870-004
R
R 29-00-00-870-006
R
R 29-00-00-870-007
R
3. Job Set-up__________
Subtask 29-00-00-860-065
Bleeding Procedure of the Yellow Hydraulic System Upstream of the Engine Pump (for corrective action) Bleeding Procedure of the Yellow Hydraulic System Upstream of the Yellow E-Pump (for corrective action) Bleeding Procedure of the Yellow Hydraulic System Downstream of the Engine Pump (for corrective action)
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(1)
Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).
(2)
Make sure that the replaced component is correctly installed.
(3)
Make sure that the hydraulic reservoir of the Yellow hydraulic system is pressurized. If necessary pressurize it (Ref. TASK 29-14-00-614-002).
Subtask 29-00-00-010-064
B. Open the main doors of the main landing gear (Ref. TASK 32-12-00-010-001).
4. Procedure
_________ Subtask 29-00-00-870-060
A. Bleeding Procedure of the Yellow Hydraulic System Upstream of the PTU CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN
_______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压1(52)