GROUND CONNECTOR - SELF-SEALING 29-12-63
REMOVAL/INSTALLATION 401 ALL
Removal of the Self-Sealing Ground 401 ALL
Connectors of the Blue Hydraulic
System
Installation of the Self-Sealing 404 ALL
Ground Connectors of the Blue
Hydraulic System
YELLOW MAIN HYDRAULIC POWER 29-13-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Component Location 2 ALL
System Description 16 ALL
Power Supply 26 ALL
Component Description 29 ALL
Reservoir 3000GR 29 ALL Engine Pump Fire-Valve 3046GD 32 ALL Engine Pump 3030GD 32 ALL Manifolds 33 001-049, 051-058
101-101,
Manifolds 34 059-099, 102-149 151-199, 201-299 301-399, 401-499
System Accumulator 3070GM 35 ALL Nitrogen Pressure Gage 3072GM 35 ALL High Pressure (HP) filter 35 ALL 3048GM. Case Drain Filter 3084GM 35 ALL Low Pressure (LP) filter 3002GM 35 ALL
29-CONTENTS Page 15 Aug 01/05 R CES
CHAPTER 29
__________
HYDRAULIC POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ Relief Valve 3063GM 35 ALL Brake Relief Valve 3067GM 35 ALL Priority Valve 3064GM 37 001-049, 051-058
101-101, Sampling Valve 3187GM 37 001-049, 051-058 101-101, Check Valves 37 001-049, 051-058 101-101,
Priority Valve 3064GM 38 059-099, 102-149 151-199, 201-299 301-399, 401-499
Sampling Valve 3187GM 38 059-099, 102-149 151-199, 201-299 301-399, 401-499
Check Valves 38 059-099, 102-149 151-199, 201-299 301-399, 401-499
Compensated Slide 3010GM 38 ALL
Operation 40 ALL
YELLOW MAIN HYDRAULIC POWER 29-13-00
ADJUSTMENT/TEST 501 ALL
Operational Test of the Yellow 501 ALL
Hydraulic System
MANIFOLD - MAIN HP 29-13-14
REMOVAL/INSTALLATION 401 ALL
Removal of the HP Manifold of the 401 ALL
Yellow Hydraulic System
Installation of the HP Manifold of 408 ALL
the Yellow Hydraulic System
MANIFOLD - PTU 29-13-15
REMOVAL/INSTALLATION 401 ALL
Removal of the Power Transfer Unit 401 ALL
(PTU) Manifold of the Yellow
Hydraulic System
Installation of the Power Transfer 409 ALL
Unit (PTU) Manifold of the Yellow
Hydraulic System
PRESSURE SWITCH - ENGINE PUMP 29-13-17
REMOVAL/INSTALLATION 401 ALL
Removal of the Engine-Pump 401 ALL
Pressure Switch (3074GD)
Installation of the Engine-Pump 406 ALL
Pressure Switch (3074GD)
PRESSURE GAGE - ACCUMULATOR AIR, 29-13-21
29-CONTENTS Page 16 Aug 01/05 R CES
CHAPTER 29
__________
HYDRAULIC POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ YELLOW POWER
REMOVAL/INSTALLATION 401 ALL Removal of the Accumulator-Air 401 ALL Pressure Gage (3072GM) Installation of the 405 ALL Accumulator-Air Pressure Gage (3072GM)
VALVE - CHARGING, YELLOW POWER 29-13-22
ACCUMULATOR
REMOVAL/INSTALLATION 401 ALL Removal of the Accumulator-Gas 401 ALL Charging Valve (3071GM) Installation of the 405 ALL Accumulator-Gas Charging Valve (3071GM)
RELIEF VALVE 29-13-32
REMOVAL/INSTALLATION 401 ALL Removal of the Pressure Relief 401 ALL Valve of the Yellow Hydraulic System (3063GM) Installation of the Pressure 406 ALL Relief Valve of the Yellow Hydraulic System (3063GM)
PRIORITY VALVE 29-13-33
REMOVAL/INSTALLATION 401 ALL Removal of the Priority Valve of 401 ALL the Yellow Hydraulic System (3064GM) Installation of the Priority Valve 406 ALL of the Yellow Hydraulic System (3064GM)
VALVE - FLUID SAMPLING 29-13-34
REMOVAL/INSTALLATION 401 ALL Removal of the Fluid Sampling 401 ALL Valve of the Yellow Hydraulic System (3187GM) Installation of the Fluid Sampling 406 ALL Valve of the Yellow Hydraulic System (3187GM)
CHECK VALVE - ENGINE 2 THRUST REVERSER 29-13-35
REMOVAL/INSTALLATION 401 ALL Removal of the Engine 2 Thrust 401 ALL Reverser Check Valve (3010KM2) Installation of the Engine 2 405 ALL Thrust Reverser Check Valve (3010KM2)
29-CONTENTS Page 17 May 01/05 R CES
CHAPTER 29
__________
HYDRAULIC POWER
TABLE OF CONTENTS
_________________
SUBJECT_______ CH/SE/SU _ PAGE EFFECTIVITY
________ C ____ ___________ CHECK VALVE - ENGINE 2 PUMP DELIVERY 29-13-36
REMOVAL/INSTALLATION 401 ALL Removal of the Engine 2 Yellow 401 ALL Hydraulic Pump Delivery Check Valve (3050GM). Installation of the Engine 2 405 ALL Yellow Hydraulic Pump Delivery Check Valve (3050GM).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压1(32)