• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-18 23:59来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Frederic Picard presented the main Interoperability issues identified so far. The presentation slides
are SC214-78 Plenary 7 Day 3 ISPR Report .ppt. The decision made in the discussions that followed
was:
Decision [P7-5]: STANDBY shall be an automatic reply to downlinks until the NDA assumes control of
the flight.
Christian Bousmanne presented the report of the D-TAXI breakout group. The presentation slides are
SC214-78 Plenary 7 Day 3 DTAXI Report .ppt.
9. Day 5: Review of the open/key issues by the break-out groups
Jose Roca presented the results of the General Issues breakout group. The presentation slides are
SC214-78 Plenary 7 Day 5 General Report.ppt.
Thierry Lelievre presented the results of the ISPR breakout group. The presentation slides are
SC214-78 Plenary 7 Day 5 ISPR Report .ppt. The decisions made in the discussions that followed
were:
Decision [P7-6]: TTr aircraft timer will no longer be required.
Issue [P7-4]: TTs timer values must be determined. Should it be on single value everywhere or
different local values are acceptable?
Frederic Picard presented the results of the Interop breakout group. The presentation slides are
SC214-78 Plenary 7 Day 5 Interop Report .ppt. The action raised in the discussions that followed
was:
Action [P7-4]: The Interop Subroup shall identify all the issues related to the FANS accommodation
for the 4DTRAD service and report them to the 4DTRAD subgroup.
Status: Open; New
John Gonda presented the results of the 4DTRAD breakout group. The presentation slides are
SC214-78 Plenary 7 Day 5 4DTRAD Report .ppt.
10. Document Approvals – Resolutions Implementation Plan
The SPR, 4DTRAD and Interop editors informed the group that all the comments would be fully
implemented in the document by the 24 April 2009. They invited all SC-214/WG-78 members to
review the resolutions proposed to their comments and inform the relevant editors before the 10th April
if the proposed resolution was not satisfactory. The tables with all the proposed resolutions are the
following attachments: 1) SPR Master Comment Matrix Plenary 7.xls, 2) INTEROP Comments Plenary
7.xls, and 3) 4DTRAD Comments_2009-04-01+sof.xls.
Action [P7-5]: All members to review the proposed resolutions to their comments prior to 10th April.
Status: Open; New
6
11. Review Dates, Location and Agenda for Next Meetings
Jose Roca presented the new proposed subgroups structure to progress the work until the end of
2009 and the planned Plenary and subgroups meetings. The group agreed to the proposed
subgroups structure and the meetings plan. The proposed subgroups co-chairs accepted the task.
The issue and action in the discussions that followed were:
Issue [P7-4]: What subgroup should produce the ITP SPR? To be resolved when SC-186/WG-53
delivers the expected ITP material.
Action [P7-6]: Susan and Jose to create the new email distribution lists for the new subgroups asap.
Status: Open; New
12. Any Other Business
Jose Roca informed the group that his responsibilities in Eurocontrol had changed and he would no
longer be able to continue with the WG-78 chairmanship. Danny Van Roosbroek will take over his
WG-78 membership.
The group thanked General Dynamics for their welcome and excellent support.
All the papers referred to in these minutes can be downloaded from http://www.faa.gov/go/sc214
- S -
Jane Hamelink
Secretary, SC-214/WG-78
CERTIFIED as a true and accurate summary of the meeting.
- S -
Paul Mettus
Co-Chairman, SC-214/WG-78
- S -
Jose Roca
Co-Chairman, SC-214/WG-78
Amended Plenary 6 Minutes
Annex A: Amended Plenary 6 Minutes
EUR 302-08/ WG78-07 Malakoff, December 24th, 2008
MINUTES OF THE 6th PLENARY MEETING OF WG-78/SC-214
“Standards for Air Traffic Data Communication Services”
Date 8 to 12 December 2008
Place Toulouse (FRANCE)
Hosted by ALTRAN Sud-Ouest
The attendees included:
Co-Chairman SC-214/WG-78
Jose Roca EUROCONTROL
Paul Mettus Lockheed Martin Corporation
Secretary SC-214/WG-78
Jane Hamelink Thane, Inc.
Members (Present)
Gregg Anderson Federal Aviation Administration (telcon)
Arnaud Baus Altran
Gayraud Bernaud DSNA/DTI
Gerhard Berz EUROCONTROL
Achim Billion DFS
Brent Blackwell MITRE Corporation/CAASD
Christian Bousmanne EUROCONTROL
David Bowen EUROCAE
Willem Brondsema EUROCONTROL
Geoff Burtenshaw UK CAA
Claudia Chitty Lockheed Martin Corporation
Chris Collings Harris Corporation
Jerome Condis Airbus France
Thierry Courdacher Thales Air Systems
Cedric D’Silva Thales Avionics
Guy Decker Thales Avionics
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料20(79)