Spain
CAR/SAM States
Estimated Project
Requirements
Speakers
Travel
$ 1,000 x 5 (speakers)
x 4 (events) = $ 20,000
DSA
$ 200 x 6 (days)
x 5 (speakers)
x 4 (events) = $ 24,000
Total $ 44,000
Action for GEASA
Approve the proposed ICAO/PAAST
Runway Safety and Runway Incursion
Project
Identify funding source for Speaker
expenses
Raymond Ybarra
Regional Director
North American, Central American and Caribbean
Office
CAR/SAM ATS Quality Assurance
Programme Workshop Project
Problem Identified
Studies were conducted by the CAR/SAM
Planning and Implementation Group
(GREPECAS) to identify causes of ATS
incidents and accidents in the CAR/SAM
Regions.
The most prominent deficiency noted was
the unsatisfactory use of approved
Aeronautical Phraseology by Air Traffic
Controllers and Pilots.
As a result, the GREPECAS concluded that
structural measures needed to be taken in
order to resolve phraseology deficiencies
Proposed Solution
Recognizing that the absence of an
adequate Quality Assurance Organization
in ATS facilities in the CAR/SAM Regions
could have significant adverse effects on
the safety of international civil aviation:
the ICAO NACC Office developed the ATS
Quality Assurance Programme
presented a Workshop Project for the
implementation of ATS Quality Assurance
Programmes to GEASA/1
Proposed Solution
Provide States/Territories/International
Organizations with the necessary tools to verify
and control the quality of their ATS services based
on Annex 11, PANS/ATM Doc. 4444 and the
CAR/SAM Regional Guidance Material on Air
Traffic Services Quality Assurance Programmes;
Enhance knowledge and skills of Air Traffic
Controllers and pilots in
States/Territories/International Organizations so as
to improve the use of approved Aeronautical
Phraseology and the provision of Air Traffic
Services;
Proposed Solution
Minimize ATS incidents and accidents
related to the improper use of
approved Aeronautical Phraseology
through ATS Quality Assurance
Programmes and educational events
as part of the GREPECAS Work
Programme.
Project Activities
The project consists of ten 5-day Workshops for:
Air Traffic Controllers, Training Staff, Quality
Assurance Personnel
Secure funding for Instructor expenses
The ICAO NACC Regional Office will:
Prepare bilingual workshop programme/material
Identify and select Instructors
Secure workshop hosts
Conduct Workshops
Project Requirements
Venue, facilities and support services
Host
Workshop instructors time
Experts seconded from lead States
Workshop instructors expenses
Funding to be identified by WHTI/GEASA
Possible Workshop Locations
Phase I
Trinidad and
Tobago
Haiti
Aruba/ Netherlands
Antilles
Bahamas
Cuba/ Dominican
Republic
Phase 2
Colombia
Venezuela
Bolivia
Peru
Chile
Estimated Project Costs
Instructor Expenses
Travel
USD 1,000
DSA
6 nights @ USD 200
Sub-total per instructor
USD 2,200
2 Instructors per workshop
Sub-total per workshop
USD 4,400
Total for 10 workshops
USD 44,000
Action for GEASA
Approve the proposed Workshop
Project for the implementation of the
Quality Assurance Programmes
Identify funding source for Instructor
expenses
Recap
PAAST
ALAR/CFIT Toolkit Workshops
RIPP Seminars
ATS Quality Assurance Workshops
Thank you
Supply Chain Process Capability
& Product Realization Process
Strategy Streams
IAQG General Assembly
San Diego, April 7, 2006
Bernard Lauras
Airbus
European Sector leader
Product Realisation Process
Barbara O’Dell
The Boeing Company
IAQG Stream Leader
Supply Chain Process Capability
Sub Tier Control as a Source of Risk
To Regulators and Customers
Poor Control of Sub Tiers is viewed as a Risk
Source of Non-