• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-10-30 09:32来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A

757 MAINTENANCE MANUAL
 LANDING GEAR DOOR GROUND OPERATIONS AND LOCKING PROCEDURE -
___________________________________________________________ MAINTENANCE PRACTICES
_____________________
 1.  General_______
 A.  The door locks for the nose and main landing gear must be installed before you do work in or near the wheel wells.
 B.  This procedure contains two tasks. Task one opens the landing gear doors and installs the door locks. Task two removes the door locks and closes the landing gear doors.
 TASK 32-00-15-402-010
 2.  Open the Doors for the Landing Gear and Install the Door Locks______________________________________________________________
 A.  Equipment
 (1)  
Door Actuator Lock Equipment, MLG - B32012-45

 (2)  
Door Actuator Lock, NLG - B32013-12

 B.  
References

 (1)  
06-41-00/201, Fuselage (Major Zones 100 and 200) Access Doors and Panels

 (2)  
24-22-00/201, Electrical Power - Control

 (3)  
29-11-00/201, Pressurize/Depressurize Main Hydraulic System

 (4)  
32-00-20/201, Landing Gear Downlocks

 C.  
Access

 (1)  
Location Zones
 115/116 Nose Landing Gear (NLG) Wheel Well
 143/144 Main Landing Gear (MLG) Wheel Well
 711 Nose Landing Gear
 713/714 Forward NLG Doors
 715/716 Aft NLG Doors
 731/741 Main Landing Gear
 732/742 MLG Body Doors
 733/743 MLG Oleo Doors


 (2)  
Access Panels
 197PL Ground Control Access Door (Left)
 198PR Ground Control Access Door (Right)

 

 

 32-00-15
 ALL  ú ú 01 Page 201 ú Jun 20/94
 
A

757
MAINTENANCE MANUAL

N0SE LANDING 
DOOR GEAR DOOR 
CLOSE 
CLOSE SWITCH 
OFF  SWITCH NOSE S10193 
DOOR CLOSE 
ON 
OFF  S00324 
SWITCH NLG 
W/W INSP LT 
NOSE LANDING GEAR 
LEFT EQUIPMENT  S10361 
PANEL, P63  NOSE GEAR DOOR UNSAFE LIGHT 
PRESS TO TEST SW 
SEE  A 

SEE  B 
GEAR DOOR LANDING RIGHT MAIN  OPEN SWITCH ALL DOORS  ARM SWITCH ALL DOORS OPEN 
CSEE PANEL, P72 ELECTRICAL SERVICE MAIN WHEEL WELL 

MAIN LANDING GEAR DOOR CLOSE SWITCH
B
C
Door Ground Control Switches Figure 201
F03464
 

 32-00-15
 ALL  ú ú 01 Page 202 ú Jun 20/95
 
A

757 MAINTENANCE MANUAL
NOSE WHEEL
SPIN BRAKE (REF)

SEE  B 
NLG DOOR ACTUATOR 
LOCK - B32013-12 
SEE  A 
NLG DOOR 
LOCK PIN 
WARNING  OUTBD  FWD 
STREAMER 
NLG DOOR ACTUATOR LOCK - B32013-12 

NLG DOOR ACTUATOR LOCK ARM
NLG DOOR LOCKPIN
B
Nose Landing Gear (NLG) Door Lock Installation Figure 202


 32-00-15
 ALL  ú ú 01 Page 203 ú Jun 20/95
 
A

757
MAINTENANCE MANUAL

MLG DOOR ACTUATOR
LOCK EQUIPMENT -B32012-32

SEE B
DOOR SAFETY VALVE
MLG DOOR LOCK RELEASE MECHANISM
SEE A
DOOR RELEASE INTERLOCK ACTUATOR
DOOR
ACTUATOR
MLG DOOR LOCK 1
DOOR LOCK RELEASE ACTUATOR MLG DOOR ACTUATORFWD LOCK
MLG DOOR LOCK RELEASE MECHANISM
MLG DOOR ACTUATOR LOCK
A
EQUIPMENT CLAMP
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 起落架 CHAPTER 32 - LANDING GEAR 1(19)