• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-11 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
757 MAINTENANCE MANUAL
 E. Prepare for the Installation
 S 434-056
 (1)  If the hydraulic reservoir has a depressurization valve installed, do this step:
 (a)  Install the reservoir depressurization valve on the reservoir (AMM 29-11-25/401).
 S 434-027
 (2)  
Install the pressure relief valve on the reservoir
 (AMM 29-11-24/401).


 S 434-028

 (3)  
Install the drain valve on the reservoir (AMM 29-11-22/401).

 S 434-029

 (4)
Install the sampling valve on the reservoir (AMM 29-11-23/401).

 S 434-030

 (5)  
Install the fluid quantity transmitter on the reservoir
 (AMM 29-33-01/401).


 S 434-031

 (6)
Install the pressure switch on the reservoir (AMM 29-35-01/401).

 S 434-032

 (7)  
Install the temperature transmitter on the reservoir
 (AMM 29-32-03/401).


 S 644-033

 (8)  
Apply hydraulic lubricant or hydraulic fluid to the O-rings (6, 8, 10) and the threads of the unions.

 S 434-034

 (9)  
Install the new O-rings (6, 8, 10) on the unions (5, 7, 9).

 S 434-035

 (10)
 Install the unions (5, 7, 9) in the ports on the reservoir.

 F.
Install the Reservoir (Fig. 401)


 S 144-036
 (1)  
Clean the surfaces of the reservoir to make a good electrical bond.

 S 624-037

 (2)  
Apply corrosion preventative compound to the holes for the bolts in the reservoir.

 (3)  
Hold the reservoir on the support bracket.


 S 424-038
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-11-21
 ALL  ú ú 01 Page 406 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL

 (4)  S 424-039Install the bolts (11), the washers (12, 13) and the nuts (14).
 (5)  S 434-040Tighten the bolts (11) to 65-100 pound-inches.
 (6)  S 424-041Install the bolt (1), the washers (2, 3) and the nut (4) to connect the support rod to the reservoir.
 (7)  S 434-042Tighten the bolt (1) to 130-200 pound-inches.
 (8)  S 434-043Connect the electrical connectors to these components: (a) Fluid quantity transmitter (b) Pressure switch (c) Temperature switch.
 (9)  S 434-044Remove the caps from the hydraulic lines and the openings in the reservoir.
 S 434-045

 (10)
 Connect the tube to the pressure relief valve.

 S 434-046

 (11)
 Connect the reservoir pressurization line to the reservoir.

 S 864-047

 (12)
 Remove the DO-NOT-CLOSE tags and close these circuit breakers on the overhead panel, P11:

 (a)
11K15, HYDRAULICS ELEC PUMP C1

 (b)
11K19, HYDRAULICS QTY CTR

 (c)
11K24, HYDRAULICS ELEC PUMP C2

 (d)
EICAS (6 locations)

 


 S 114-048
 CAUTION: QUICKLY CLEAN THE INSTALLATION AREA OF ALL HYDRAULIC FLUID.
_______ THE HYDRAULIC FLUID CAN CAUSE DAMAGE TO THE AIRPLANE EQUIPMENT.
 (13)
 Clean all hydraulic fluid from the area of the reservoir (AMM 12-25-01/301).

 S 614-049

 (14)
 Fill the reservoir in the center hydraulic system (AMM 12-12-01/301).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 液压 CHAPTER 29 - HYDRAULIC POWER 2(3)