• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-11 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 29-21-51
 ALL  ú ú 01 Page 401 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

AFT BULKHEAD OF THE
RIGHT WHEEL WELL

SEE A
FWD
GROUND TACHOMETER MANUAL SWITCH
FAIRING TACHOMETER AND GROUNDPANEL MANUAL SWITCH FOR THE RAM AIR TURBINE (RAT)
SEE B
ACCESS
PANEL

AFT BULKHEAD OF THE RIGHT WHEEL WELL MOUNTING A BRACKET
FWD
BOLT ELECTRICAL (4 LOCATIONS) CONNECTOR (2 LOCATIONS)
SCREW
BOLT (4 LOCATIONS) (EXAMPLE)
TACHOMETER AND GROUND MANUAL SWITCH
B

Tachometer and Ground Manual Switch Installation Figure 401
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-21-51
 ALL  ú ú 01 Page 402 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 TASK 29-21-51-424-009
 3.  Install the Tachometer and Ground Manual Switch for the Ram Air_______________________________________________________________ Turbine (RAT)_____________
 A.  References
 (1)  
AMM 29-21-00/201, Ram Air Turbine (RAT) System

 (2)  
AMM 29-21-00/501, Ram Air Turbine (RAT) System


 B.  Access
 (1)  
Location Zones
 198 Wing to Body - Aft Lower Half (Right)


 (2)  
Access Panel
 198MR RAT Compartment

 

 C.  Install the Tachometer and Ground Manual Switch (Fig. 401)
 S 424-010
 (1)  
Put the tachometer and ground manual switch on the mounting bracket.

 S 434-011

 (2)
Install the bolts for the tachometer and ground manual switch.

 S 434-012

 (3)  
Connect the electrical connectors to the tachometer and the ground manual switch.

 S 434-013

 (4)  
Install the screws to attach the fairing panel.

 S 714-014

 (5)  
Do the test for the RAT hydraulic pump to make sure the tachometer operates correctly (AMM 29-21-00/501).

 (6)  
Retract the RAT (AMM 29-21-00/201).


 S 864-015
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-21-51
 ALL  ú ú 01 Page 403 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 RAM AIR TURBINE (RAT) AIRSPEED SWITCH - REMOVAL/INSTALLATION
____________________________________________________________
 1.  General_______
 A.  This procedure contains two tasks, one to remove and one to install the airspeed switch on the ram air turbine (RAT).
 B.  The airspeed switch is installed on a stanchion on the outboard side of the E1 rack in the main equipment bay.
 TASK 29-21-53-024-001
 2.  Remove the Airspeed Switch for the Ram Air Turbine (RAT)________________________________________________________
 A.  Equipment
 (1)  RAT Circuit Breaker Lock Set - B27065-9 or Equialent
 B.  Access
 (1)  
Location Zones
 119 Main Equipment Center
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 液压 CHAPTER 29 - HYDRAULIC POWER 2(117)