29-21-51
 ALL  ú ú 01 Page 401 ú May 28/99 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
757 
MAINTENANCE MANUAL
AFT BULKHEAD OF THE 
RIGHT WHEEL WELL
SEE A 
FWD 
GROUND TACHOMETER MANUAL SWITCH 
FAIRING TACHOMETER AND GROUNDPANEL MANUAL SWITCH FOR THE RAM AIR TURBINE (RAT)
SEE B 
ACCESS 
PANEL
AFT BULKHEAD OF THE RIGHT WHEEL WELL MOUNTING A BRACKET 
FWD 
BOLT ELECTRICAL (4 LOCATIONS) CONNECTOR (2 LOCATIONS) 
SCREW 
BOLT (4 LOCATIONS) (EXAMPLE) 
TACHOMETER AND GROUND MANUAL SWITCH 
B
Tachometer and Ground Manual Switch Installation Figure 401 
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 29-21-51
 ALL  ú ú 01 Page 402 ú May 28/99 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
757 MAINTENANCE MANUAL
 TASK 29-21-51-424-009
 3.  Install the Tachometer and Ground Manual Switch for the Ram Air_______________________________________________________________ Turbine (RAT)_____________
 A.  References
 (1)  
AMM 29-21-00/201, Ram Air Turbine (RAT) System
 (2)  
AMM 29-21-00/501, Ram Air Turbine (RAT) System
 B.  Access
 (1)  
Location Zones
 198 Wing to Body - Aft Lower Half (Right)
 (2)  
Access Panel
 198MR RAT Compartment
 C.  Install the Tachometer and Ground Manual Switch (Fig. 401)
 S 424-010
 (1)  
Put the tachometer and ground manual switch on the mounting bracket.
S 434-011
 (2) 
Install the bolts for the tachometer and ground manual switch.
S 434-012
 (3)  
Connect the electrical connectors to the tachometer and the ground manual switch.
S 434-013
 (4)  
Install the screws to attach the fairing panel.
S 714-014
 (5)  
Do the test for the RAT hydraulic pump to make sure the tachometer operates correctly (AMM 29-21-00/501).
 (6)  
Retract the RAT (AMM 29-21-00/201).
 S 864-015
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 29-21-51
 ALL  ú ú 01 Page 403 ú May 28/99 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
A
757 MAINTENANCE MANUAL
 RAM AIR TURBINE (RAT) AIRSPEED SWITCH - REMOVAL/INSTALLATION
____________________________________________________________
 1.  General_______
 A.  This procedure contains two tasks, one to remove and one to install the airspeed switch on the ram air turbine (RAT).
 B.  The airspeed switch is installed on a stanchion on the outboard side of the E1 rack in the main equipment bay.
 TASK 29-21-53-024-001
 2.  Remove the Airspeed Switch for the Ram Air Turbine (RAT)________________________________________________________
 A.  Equipment
 (1)  RAT Circuit Breaker Lock Set - B27065-9 or Equialent
 B.  Access
 (1)  
Location Zones
 119 Main Equipment Center
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 液压 CHAPTER 29 - HYDRAULIC POWER 2(117)