• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-11 13:08来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 The vent in the air pressure line to the center hydraulic reservoir is in the hydraulic bay, in the aft left wing/body fairing.
 S 215-071
 (37)
 Make sure the (L, R, C) RSVR PRESS indication on the EICAS display does not change from NORM to LOW for a minimum of one hour.

 S 865-079

 (38)
 On the reservoir in each hydraulic system, hold the manual depressurization valve in the open position to remove the air pressure.

 S 215-080

 (39)
 Make sure the (L, R, C) RSVR PRESS indication on the EICAS display shows LOW.

 S 865-087

 (40)
 Let the spring put the manual depressurization valve in the closed position.

 S 215-129

 (41)
 Make sure the (L, R, C) RSVR PRESS indication on the EICAS display does not change from NORM to LOW for a minimum of one hour.

 F.
Put the Airplane Back to Its Usual Condition


 S 865-135
 (1)  Put the engine shutdown input to EICAS back to its usual condition (AMM 31-41-00/201).
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-35-00
 ALL  ú ú 02 Page 506 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (2)  S 415-136Close the left and right access doors, 193HL and 194ER, for the ECS components (AMM 06-41-00).
 (3)  S 215-137Close the access panel, 197KL, for the central hydraulic service center (AMM 06-41-00/201).
 S 095-138

 WARNING: USE THE PROCEDURE IN AMM 32-00-15/201 TO REMOVE THE DOOR LOCKS.
_______ THE DOORS OPEN AND CLOSE QUICKLY AND CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
 (4)  
Remove the door locks from the landing gear doors and close the doors (AMM 32-00-15/201).

 S 865-139

 (5)  
Remove electrical power, if it is not necessary (AMM 24-22-00/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 29-35-00
 ALL  ú ú 02 Page 507 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757 MAINTENANCE MANUAL
 HYDRAULIC RESERVOIR PRESSURE SWITCH - REMOVAL/INSTALLATION
__________________________________________________________
 1.  General_______
 A.  This procedure has two tasks. The first task removes the pressure switch on the reservoir in the left, right, and center hydraulic systems. The second task installs the pressure switch.
 TASK 29-35-01-004-001
 2.  Remove the Pressure Switch (Fig. 401)__________________________
 A.  References
 (1)  
AMM 06-41-00/201, Fuselage Access Doors and Panels

 (2)  
AMM 29-11-00/201, Main (Left, Right, and Center) Hydraulic Systems

 (3)  
AMM 32-00-15/201, Landing Gear Door Locks

 (4)  
AMM 32-00-20/201, Landing Gear Downlocks


 B.  Access
 (1)  
Location Zones
 143/144 MLG Wheel Well
 197 Wing to Body - Aft Lower Half (Left)


 (2)  
Access Panel
 197KL Central Hydraulic Service Center

 

 C.  Procedure
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 液压 CHAPTER 29 - HYDRAULIC POWER 2(190)