• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (1) At the track 1 position:
 (Ref. Fig. 401A/TASK 27-54-55-991-001-A)

 (a)
 Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of the actuator lever (17).

 (b)
 Install the actuator lever (17) into the No.1 flap track beam.

 (c)
 Connect the No.1 flap track beam to the aircraft structure at the forward and the rear mountings (Ref. TASK 57-51-33-400-001).

 (d)
 Apply a layer of SPECIAL MATERIALS (Material No. 05-002) to the thread of the nuts (18).

 (e)
 Install the cover shell (1) with the bolts (2), (3) and (4) and the nuts (18).

 (f)
 TORQUE the bolts (2), (3) and (4) to between 1.4 and 1.6 m.daN


 (10.32 and 11.79 lbf.ft).
 (g)
 Remove the adjustable strut.

 (h)
 Install the bushes (12) on the lever (17).

 (i)
 Connect the lever (17) to the flap link arm (5) as follows:

 (j)
 Put and hold the packers (11) and (13) in position on the lever (17).

 (k)
 Put the lever (17) in position on the flap link arm (5).


R 1EFF : 062-099, 104-105, 151-158, 204-210, 1 27-54-55Page 440 1 1 Aug 01/05 1 1 1CES 1


 (2) At the track 2 position: R
 (Ref. Fig. 402/TASK 27-54-55-991-004) R
R (a) Connect the lever (28) to the flap link arm (32) as follows:
 1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)
_
 and to the nut (31).

 2 Install the bolt (33), the washer (29) and the nut (31).
_
 (3)
 Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).

 (4)
 At the track 1 position:

 (a)
 TORQUE the nut (15) to between 1.6 and 1.8 m.daN (11.79 and 13.27 lbf.ft) and safety with a new cotter pin (14).

 (b)
 Install the indicator pin (9), the indicator plate (8), the washers (6) and the bolts (7).

 (c)
 TORQUE the bolts (7) to between 0.15 and 0.17 m.daN (13.27 and


 15.04 lbf.in).

 (5)
 At the track 2 position:

 (a) TORQUE the nut (31) to between 10 and 12 m.daN (73.74 and 88.49 lbf.ft) and safety with a new cotter-pin (30).

 (6)
 At tracks 1 and 2:

 (a)
 Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts

 (10)
 and (33) and the nuts (15) and (31) after assembly.

 

 (7)
 Install the Flap Track 1 Actuator 6205CM(6255CM) (Ref. TASK 27-54-49-400-001).


R 1EFF : 062-099, 104-105, 151-158, 204-210, 1 27-54-55Page 441 1 1 Aug 01/05 1 1 1CES 1 Subtask 27-54-55-420-061-A


 C. Installation of the Flap-Actuator Lever Assembly - Track 2
 WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
 (1) At the track 2 position:
 (Ref. Fig. 402/TASK 27-54-55-991-004)

 (a)
 Apply SEALANTS (Material No. 09-018) to the bolts (43).

 (b)
 Install the bolts (43) in the outboard bracket (36) with the bolt heads inboard.

 (c)
 Apply SEALANTS (Material No. 09-018) or SEALANTS (Material No. 09-019) to the mating face of the anti-rotation plate (42).

 (d)
 Install the anti-rotation plate (42) on the bolts (43) and loosely install the nuts (41).

 (e)
 Apply SPECIAL MATERIALS (Material No. 05-064) to the holes of the bearing housings in the brackets (36).

 (f)
 Apply SEALANTS (Material No. 09-018) to the plain shank and flange of the bearing housing (34).

 (g)
 Install the bearing housing (34) in the outboard bracket (36) and tighten the nuts (41).

 (h)
 Apply COMMON GREASE (Material No. 04-022) to the ring nut (40).

 (i)
 Install the ring nut (40) on the bearing housing (34).

 (j)
 Torque the ring nut (40) with the SPANNER-FLAP LEVER TRACKS 2 AND 3 (98D27504028000) to between 1.4 and 1.5 m.daN (10.32 and 11.06 lbf.ft).


R 1EFF : 062-099, 104-105, 151-158, 204-210, 1 27-54-55Page 442 1 1 Aug 01/05 1 1 1CES 1
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵5(175)