• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 3M (10 FT)
 No specific 1 CONTAINER 5 L(1 1/2 USGAL)
 No specific 1 WARNING NOTICE

R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) 98D27504005000 1 PIN RIGGING-FLAPS (TRACK 1) 98D27504006000 1 PIN RIGGING FLAPS 98D27803000000 1 LOCKING TOOL - FLAP/SLAT CONTROL LEVER


 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
R Material No. 02-003 F NSA 307110 TYPE 4 HYDRAULIC FLUID (PHOSPHATE ESTER BASE) (Ref. 20-31-00) Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 05-054 ZINC POWDER(USE WITH 05-002) (Ref. 20-31-00) Material No. 06-001 USA MIL-L-23398 SOLID FILM LUBRICANT (NO LONGER PRODUCED) (Ref. 20-31-00) Material No. 11-004 USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
 -------------------------------------------------------------------------------
1 O-ring 27-84-51 01 -070 6 back-up rings 27-84-51 01 -150 7 O-rings 27-84-51 01 -160
 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart 27-00-00-080-002 Removal of the Flap/Slat Control-Lever Locking Tool (98D27803000000) 27-00-00-480-002 Installation of the Flap/Slat Control-Lever Locking
 Tool (98D27803000000)
 27-50-00-866-009 Retraction of the Flaps on the Ground
 27-54-00-710-001 Operational Test of the Flap System
 29-10-00-863-001 Pressurize the Green Hydraulic System
 29-10-00-863-002 Pressurize the Yellow Hydraulic System

 

 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 32-12-00-010-001 Open the Main Gear Doors for Access
 32-12-00-410-001 Close the Main Gear Doors after Access
 27-54-54-991-002 Fig. 402

 3. Job Set-up
__________

R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 Subtask 27-54-54-860-055
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the main doors of the main gear are open (Ref. TASK 32-12-00-010-001).

 (2)
 Make sure that the flaps are retracted to the 0 degree position (Ref. TASK 27-50-00-866-009).

 (3)
 Make sure that the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) (Ref. TASK 27-00-00-480-002) is installed on the slat/flap control lever.

 (4)
 Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the opening of the main door of the main gear.

 (5)
 Make sure that the Green and the Yellow hydraulic systems are depressurized and put them in the maintenance configuration (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).

 (6)
 Make sure that the reservoirs of the Green and the Yellow hydraulic systems are depressurized (Ref. TASK 29-14-00-614-001).

 (7)
 Make sure that the WARNING NOTICE is in position to tell persons not to pressurize the Green and Yellow hydraulic systems.

 (8)
 Make sure that the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) is installed at the left and right flap-track positions 1.

 


R  (9) Make sure that a CONTAINER 5 L(1 1/2 USGAL) is in position below the 
R  hydraulic motor (5). 
R  **ON A/C 301-399, 
R  Subtask 27-54-54-860-055-A 
R  A. Aircraft Maintenance Configuration 
R  (1) Make sure that the main doors of the main gear are open (Ref. TASK 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵5(161)