R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 27-54-54-860-053
A. Aircraft Maintenance Configuration
(1)
Make sure that the main doors of the main gear are open (Ref. TASK 32-12-00-010-001).
(2)
Make sure that the flaps are retracted to the 0 degree position (Ref. TASK 27-50-00-866-009).
(3)
Make sure that the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) (Ref. TASK 27-00-00-480-002) is installed on the slat/flap control lever.
(7)
Make sure that the warning notice are in position to tell persons not to pressurize the hydraulic
(8)
Make sure that the PIN RIGGING FLAPS (98D27504006000) is installed at the left and right flap track positions 1.
(9)
Make sure that a container is in position below the Power Control Unit (PCU) (1).
(4) Make sure that the access platform is in position at the opening of the main door of the main gear.
(5) Make sure that the Green and the Yellow hydraulic systems are depressurized and put them in the maintenance configuration (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(6) Make sure that the reservoirs of the Green and the Yellow hydraulic systems are depressurized (Ref. TASK 29-14-00-614-001).
R R (7) Make sure that the WARNING NOTICE is in position to tell persons not to pressurize the Green and Yellow hydraulic systems.
R R (8) Make sure that the PIN RIGGING-FLAPS (TRACK 1) (98D27504005000) is installed at the left and right flap-track positions 1.
(9) Make sure that a container is in position below the Power Control Unit (PCU) (1).
**ON A/C 301-399,
Subtask 27-54-54-860-053-A
A. Aircraft Maintenance Configuration
(1) Make sure that the main doors of the main gear are open (Ref. TASK 32-12-00-010-001).
(2) Make sure that the flaps are retracted to the 0 degree position (Ref. TASK 27-50-00-866-009).
(3) Make sure that the LOCKING TOOL - FLAP/SLAT CONTROL LEVER (98D27803000000) (Ref. TASK 27-00-00-480-002) is installed on the slat/flap control lever.
(4) Make sure that the access platform is in position at the opening of the main door of the main gear.
(5) Make sure that the Green and the Yellow hydraulic systems are depressurized and put them in the maintenance configuration (Ref. TASK 29-10-00-864-001) (Ref. TASK 29-10-00-864-002).
(6) Make sure that the reservoirs of the Green and the Yellow hydraulic systems are depressurized (Ref. TASK 29-14-00-614-001).
**ON A/C ALL
Subtask 27-54-54-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21
4. Procedure
_________
(Ref. Fig. 401/TASK 27-54-54-991-001)
Subtask 27-54-54-910-052
A. Preparation for Installation
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
1EFF : ALL 1 27-54-54Page 411 1 1 Aug 01/04R 1 1 1CES 1
(3)
Use CLEANING AGENTS (Material No. 11-004) and fully remove the anti-corrosion compound from:
-
the contact face of the hydraulic motor,
-
the contact faces of the Pressure-Off Brake (POB),