• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-21 14:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 1EFF : ALL 1 27-54-49Page 417 1 1 May 01/05R 1 1 1CES 1


 TASK 27-54-49-000-001
 Removal of the Flap Track 1 Actuator 6205CM(6255CM)
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
_______
 -
DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.

 -
DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.


 -MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY. INCORRECT INSTALLATION CAN CAUSE DAMAGE.
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific clamp No specific safety barriers No specific warning notice No specific warning notice(s) No specific access platform 2.8 m (9 ft. 2 in.) 98D27504030001 1 LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT
 1EFF : ALL 1 27-54-49Page 418 1 1 May 01/05R 1 1 1CES 1


 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied from the External Power
 27-50-00-400-003 27-50-00-866-008 27-54-45-000-002 27-54-45-000-003 31-32-00-860-006 32-12-00-010-001 27-54-49-400-001  Installation of the Lock-Torque Shaft - Flaps and Slats (98D27504030001)Extension of the Flaps on the GroundRemoval of the Torque Shaft 6204CM(6254CM)Removal of the Torque Shaft 6206CM(6256CM)Procedure to Get Access to the SYSTEM REPORT/TEST F/CTL PageOpen the Main Gear Doors for AccessInstallation of the Flap Track 1 Actuator 6205CM(6255CM) (for corrective action)

 **ON A/C 001-049, 051-061, 101-103, 201-203,
 27-54-49-991-001 Fig. 402


R **ON A/C 062-099, 106-149, 151-199, 204-299, 401-499,
 27-54-49-991-001-B Fig. 402A
 **ON A/C 104-105,
 27-54-49-991-001-A Fig. 402B

 **ON A/C 301-399,
 27-54-49-991-001-C Fig. 402C **ON A/C 001-049, 051-061, 101-103, 201-203, 301-399, 27-54-49-991-005 Fig. 403


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------

R **ON A/C 062-099, 104-149, 151-199, 204-299, 401-499,
 27-54-49-991-005-A Fig. 403A
 FOR FIN 6205CM
 57-51-37-000-002 Removal of the Access Panels 573AB(673AB),

 573BB(673BB), 573CB(673CB)
 FOR FIN 6255CM
 57-51-37-000-002 Removal of the Access Panels 573AB(673AB),

 573BB(673BB), 573CB(673CB)
 **ON A/C ALL
 3. Job Set-up
__________
 **ON A/C 001-049, 051-061, 101-103, 201-203,

 (Ref. Fig. 402/TASK 27-54-49-991-001) R **ON A/C 062-099, 106-149, 151-199, 204-299, 401-499,
 (Ref. Fig. 402A/TASK 27-54-49-991-001-B)
 **ON A/C 104-105,

 (Ref. Fig. 402B/TASK 27-54-49-991-001-A)
 **ON A/C 301-399,

 (Ref. Fig. 402C/TASK 27-54-49-991-001-C)
 **ON A/C 001-049, 051-061, 101-103, 201-203, 301-399,

 (Ref. Fig. 403/TASK 27-54-49-991-005)


 Flap Track 1 Actuator
 Figure 402/TASK 27-54-49-991-001

R 1EFF : 001-049, 051-061, 101-103, 201-203, 1 27-54-49Page 421 1 1 May 01/05 1 1 1CES 1


 Flap Track 1 Actuator Figure 402A/TASK 27-54-49-991-001-B
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 27-54-49Page 422 1401-499, 1Aug 01/05 1 1 1CES 1


 Flap Track 1 Actuator 
R  Figure 402B/TASK 27-54-49-991-001-A 
R 1EFF :  104-105,  1  27-54-49 Page 423 
1  1  May 01/05
 1  1
 1CES  1

 

R  Flap Track 1 Actuator 
R  Figure 402C/TASK 27-54-49-991-001-C 
R 1EFF :  301-399,  1  27-54-49 Page 424 
1  1  May 01/04
 1  1
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵5(101)