曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Health Science & Technology (CPHST) (Tel: 919-513-2496)
Plants should be dried thoroughly before releasing them to the customer.
Chemical Treatments Dips
Safety Responsibilities
10/2002-04 Treatment Manual 2-12-5
PPQ
Step 9—Clean Up the Treatment Area and Equipment
Discard all empty containers, excess pesticides, packing materials,
plastic bags/backing materials, and newspaper/absorbent paper in
compliance with instructions on the Label and State/Local
regulations. Decontaminate all treatment areas and equipment while
you are wearing your PPE.
Step 10—Release the Cargo
After the plant material is dry, release it to the customer or broker if
agreed to by the airline and if it has been released by Customs.
Safety Responsibilities
The PPQ Officer is responsible for the following safety issues:
◆ Make the broker/importer aware of their responsibilities as it
pertains to:
❖ materials
❖ Personal Protective Equipment (PPE)
❖ health hazard and safety concerns when performing the dip
treatment process
◆ All personnel involved in the dip treatment process are required
to wear the appropriate and Label required PPE while performing
the treatment. PPQ Officers may need to wear PPE if the dip
treatment process area prevents them from observing the
process from outside the restricted area.
◆ Designated dip treatment process areas must be located away
from food preparation, eating areas, and offices. Al efforts should
be made to place dip treatment processes in an area containing a
mechanical exhaust.
◆ The broker/importer personnel involved with treatments must be
aware and briefed on the location of the emergency eyewash and
all other required safety equipment. They also need ti be aware of
the areas that they will be limited to working within and any
other specific restrictions determined by the PPQ Officer in
charge of the process. The PPQ Officer monitoring the process
should be aware of procedures to be followed in the event of an
accidental release of the pesticide or an injury to one of the
broker/importer’s personnel.
◆ The broker/importer’s personnel should shower as soon as
possible after performing a dip treatment. The PPQ Officer
should ensure that personnel are aware of the location and route
to the shower. Guidance should also include instruction on how
to disrobe and dispose of clothing used during dip treatment
Chemical Treatments Dips
Safety Responsibilities
2-12-6 Treatment Manual 10/2002-04
PPQ
processes. All contaminated clothing and PPE must be removed
before entering the shower room. Contaminated clothing should
be placed in plastic bags and PPE in Separate plastic bags.
◆ Broker/importer personnel should be informed that clothes wore
during treatment must be washed in hot water with detergent
and that they should be washed separately from other clothes
◆ The plant material should be released to the Broker/importer
only if they are using/provide a vehicle that has a compartment
physically separated from the cab, for example, a pick-up truck
of tractor trailer.
07/2002-03 Treatment Manual 6-1-1
PPQ
Treatment Manual
6 Certifying Facilities 1
Overview
Contents
Certification of Vacuum Fumigation Chambers page-6-2-1
Certification of Atmospheric Fumigation Chambers page-6-3-1
Certification of Cold Treatment page-6-4-1
Certification of Hot Water Immersion Facilities page-6-5-1
Certification of Forced Hot Air and Vapor Heat Treatment Facilities page-6-6-1
Certification of Niger Seed Treatment Facilities page-6-7-1
Certification of Irradiation Treatment Facilities page-6-8-1
The Certification of Facilities section of this manual is organized by the
following categories:
◆ Vacuum Fumigation Chambers
◆ Atmospheric Fumigation Chambers
◆ Cold Treatment Facilities
◆ Hot Water Immersion Facilities
◆ Forced Hot Air and Vapor Heat Treatment Facilities
◆ Niger Seed Treatment Facilities
◆ Irradiation Treatment Facilities
Domestic and foreign treatment facilities must be certified by APHIS
before they can perform treatments to meet United States quarantine
requirements. Specific requirements for each type of facility are
included in this section.
After the Center for Plant Health Science and Technology (CPHST) has
approved blueprints or drawings of a treatment facility, the treatment
facility can request certification from Plant Protection and Quarantine
at local ports or State Plant Health Directors.
Important
Blueprints or drawings of domestic treatment facilities should be sent to:
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料9(98)