曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
for fruits 5-2-70
integral containers used for cold treatment 6-4-7
to 6-4-8
approval requirements 6-4-7
list of approved F-1-1
temperature recording instruments
standards 6-4-7
intransit cold treatment of ships
approval for 3-7-2
clearance of shipments 3-7-10 to 3-7-16
initiating treatments 3-7-6 to 3-7-10
performance survey of vessels 3-7-2 to 3-7-5
progressive clearance 3-7-16
self-refrigerated containers 3-7-16 to 3-7-20
warehouses 3-7-21 to 3-7-22
schedules for 5-2-66 to 5-2-69
vessels used for intransit cold treatment 6-4-2 to
6-4-7
approval requirements 6-4-2 to 6-4-3
list of approved G-1-1
temperature recording systems standards 6-4-4
warehouses used for 6-4-8 to 6-4-9
Coles
treatment T101-n-2
MB at NAP—tarpaulin or chamber 5-2-7, 5-2-18
Collard greens
treatment schedule T101-n-2, 5-2-19
Colorimetric tubes 2-3-4
Commercial line conditioner
requirements for hot water immersion
treatment 3-3-5
Compressed air
See CO2 fire extinguishers
Compressed air specifications 8-1-22
Compressed Gas Association 8-1-22
Computers
Index
Index-1-10 Treatment Manual 10/2002-04
PPQ
A
C
E
G
I
K
M
O
Q
S
U
W
Y
B
D
F
H
J
L
N
P
R
T
V
X
Z
requirements for hot water immersion
treatment 3-3-5
Concentration readings
chamber fumigation 2-5-5, 2-5-6, 2-5-7
phosphine 2-10-9
ship fumigation 2-6-13 to 2-6-14
structure fumigation 2-7-16
tarpaulin fumigation
methyl bromide 2-4-19 to 2-4-22
Concrete surfaces
treatment T404-b-5-1
Chlorpyrifos spray 5-5-13 to 5-5-14
Conifer Christmas trees
treatment T313-a
MB (“Q” label only) at NAP—tarpaulin or
chamber 5-4-26
Conifer seeds
treatment T203-i-1
MB (“Q” label only) at NAP 5-3-27
Conogethes punctiferalis
treatment T109-a-1
(apples in plastic field bins at maximum load factor
50 percent or less) Cold treatment followed
by MB at NAP—tarpaulin or
chamber 5-2-74
Conopomorpha sinensis
treatment T107-h
Cold treatment 5-2-69
Construction
T406-d steam at NAP — tarpaulin, or tent 5-5-19
Construction equipment
treatment schedule for golden nematode
contamination 5-5-18
Container fumigation
phosphine 2-10-8
Container vessels
clearing shipments cold treated in transit 3-7-10
to 3-7-16
temperature recorders 3-7-9
temperature sensors 3-7-3 to 3-7-5, 3-7-7 to
3-7-9
Containerized cargo
aeration of 2-4-31, 2-5-6
arrangement for fumigation 2-4-7 to 2-4-8
fan arrangement 2-4-10
gas introduction line placement 2-4-11
gas sampling tube placement 2-4-11
Containers
golden nematode treatment schedule 5-5-18
potato cyst nematode treatment schedule 5-6-7
T406-d steam at NAP — tarpaulin, or tent 5-5-19
wood containers treatment schedules 5-5-14 to
5-5-16
Continuous flow system 3-3-4
Convallaria (pips)
treatment T551-1
Keep pips frozen until time for treatment, then
thaw enough to separate bundles one from another
just before treatment begins. 5-6-14
Conventions 1-1-4
Conversion factors 2-2-3
Conversion Tables D-1-1 to D-1-2
Convolvulus japonicus
treatment T553-1
Hot water at 118°F for 30 minutes. 5-6-15
Cooperative agreements 3-7-6
Copitarsia spp.
asparagus treatment schedule 5-2-3
banana treatment schedule 5-2-4
blackberry treatment schedules 5-2-6
melons treatment schedules 5-2-33
plantain treatment schedules 5-2-38
raspberry treatment schedules 5-2-41
Copra
treatment T101-x-1
MB ("Q" label only) at NAP—tarpaulin or
chamber 5-2-19
Coriander 5-2-27, 5-2-28
Coriandor 5-2-27
Coriandor (cilantro) (seed) 5-2-28
Coriandrum sativum 5-2-27, 5-2-28
Corms
treatment T202-a-1
MB (“Q” label only) at NAP—Chamber 5-3-20 to
5-3-21
Corn
treatment schedules 5-4-7, 5-6-10
Corn-on-the-Cob 5-2-56
Corn-on-the-cob
countries prohibited from exporting to the United
States 5-2-75
methyl bromide fumigation treatment
schedule 5-2-20
Corrective lenses and respiratory
protection 8-1-17, 8-1-19
Index
10/2002-04 Treatment Manual Index-1-11
PPQ
A
C
E
G
I
K
M
O
Q
S
U
W
Y
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料9(146)