• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-30 09:57来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (6)  For the normal antiskid module, pressurize the right hydraulic system and reservoir (AMM 29-11-00/201).
 S 864-070
 (7)  For the alternate antiskid module, pressurize the left hydraulic system and reservoir (AMM 29-11-00/201).
 S 864-071
 (8)  Push in the brake pedals fully four or more times.
 S 794-072
 (9)  After five minutes, do a check of the filter installation for leaks.

 

 32-42-03
 ALL  ú ú 08 Page 414 ú May 28/00
 
A
757 MAINTENANCE MANUAL
 S 714-116
 (10)
 Do a check of the operation of the brake that gets hydraulic pressure through the hydraulic line with the filter that you replaced as follows:

 (a)  
Push in the brake pedals and make sure that the brake operates.


 NOTE: Look to see that the brake wear pin moves when you push
____ in the brake pedal to make sure that the brake operates.
 S 944-074
 (11) Do the steps in the Return the Airplane to Its Usual Condition paragraph if it is not necesary to do more maintenance.
 TASK 32-42-03-424-115
 9. Antiskid Module Shutoff Valve - Removal (Fig. 401)
_______________________________________
 A. Equipment
 (1)  
T63577 - Removal and Installation Tool
 Hydro-Aire Division, Crane Co.
 Burbank, CA 91510 USA


 B.
Procedure


 S 944-108
 (1)  
Do the Prepare for Removal procedure (Ref Par. 2).

 S 024-075

 (2)  
Remove the bolts (3) from the valve.


 S 024-076
 CAUTION:_______DO NOT LET DIRT OR CONTAMINATION GET IN THE VALVE. THIS CAN CAUSE A MALFUNCTION OF THE UNIT.
 (3)  
Use the removal and installation tool to remove the valve (8) from the module (17). Put a plug in the module port.

 S 034-077

 (4)  
Remove the retainers (9) and the O-rings (10) from the valve (8). Discard the O-rings.


 TASK 32-42-03-404-078
 10. Equipment Antiskid Shutoff Valve - Installation (Fig. 401)
_______________________________________________
 A. Equipment
 (1)  
T63577 - Removal and Installation Tool
 Hydro-Aire Division, Crane Co.
 Burbank, CA 91510 USA


 B.
Consumable Materials

 (1)  
D00153 Hydraulic Fluid - BMS 3-11


 

 32-42-03
 ALL  ú ú 02 Page 415 ú Jun 20/92
 
A
757 MAINTENANCE MANUAL
 C. Parts
 ~.............................................................................. | AMM | | AIPC | ................. ............................ | FIG | ITEM | NOMENCLATURE | SUBJECT |FIG | ITEM | ................................................................................ | 401 | 3 | Bolt | 32-42-02 | 01 | 135,165 | | | | | | | 185,240 | | | 8 | Valve Assy - Shutoff | | | 235 | | | 9 | Retainer | | | 230 | | | 10 | Packing (O-Ring) | | | 225 | 2.......….......…...................................…...........…....….........1
 D. References
 (1)  
AMM 24-22-00/201, Electrical Power - Control

 (2)  
AMM 25-50-03/401, Bulkhead Lining

 (3)  
AMM 29-11-00/201, Pressurize/Depressurize Main Hydraulic System

 (4)  
AMM 32-00-15/201, Landing Gear Door Locks

 E.
Access

 (1)  
Location Zones
 143 Left Main Landing Gear Wheel Well
 144 Right Main Landing Gear Wheel Well


 F.
Procedure


 S 644-124
 (1)  Lubricate the new O-rings (10) and the new retainers (10) with hydraulic fluid before you install them on the valve.
 S 424-079
 CAUTION: DO NOT LET DIRT OR CONTAMINATION GET IN THE VALVE.
_______
 THIS CAN CAUSE A MALFUNCTION OF THE VALVE.

 (2)  
Install the new O-rings (10) and the new retainers (10) on the shutoff valve (8)

 S 484-125

 (3)  
Use the removal and installation tool to install the shutoff valve (8) in the antiskid module (17).

 S 424-080

 (4)  
Install the bolts (3) and tighten the bolts to 100-110 pound-inches. Install lockwire.

 S 864-081

 (5)  
Pressurize the right hydraulic system and reservoir
 (AMM 29-11-00/201).

 

 

 32-42-03
 ALL  ú ú 01 Page 416 ú May 28/01
 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 起落架 CHAPTER 32 - LANDING GEAR 3(34)