(b)  
Disconnect the cables at the control drum (Detail A).
 (c)  
Put an identification tag on the cables.
 (d)  
Discard the used cotter pin retainers.
 S 034-011
 (5)  
Remove the bolt that holds the top end of the spring cartridge to the piston position link (Detail A).
S 034-012
 (6)  
Remove the four bolts that hold the quadrant and the bracket assembly to the shock strut.
S 024-013
 (7)  
Remove the quadrant, link and bracket as a unit.
S 034-014
 (8)  
Do the steps that follow to disassemble the control drum, link and bracket assembly, if it is necessary:
 (a)  
Remove the nut and washer from the piston position link.
 (b)  
Remove the link and the spacer.
 (c)  
Remove the piston position shaft, washer, and control drum.
 TASK 32-51-06-404-015
 3. Install the Control Drum and Link for the Nose Wheel Steering (Fig. 401)
_____________________________________________________________
 A. Equipment
 (1)  
Rig pins: Kit B20003-XX (AMM/20-10-24/201).
 (a)  
NS6 - P/N B20003-5
 (b)  
NS7 - P/N B20003-15
 
 32-51-06
 ALL  ú ú 03 Page 403 ú May 28/99 
 
A
757 
MAINTENANCE MANUAL
 (2)  
Towing Lever Lockpin - A09003-1
 B. 
References
 (1)  
AMM 32-21-09/401, Nose Gear Torsion Links
 (2)  
AMM 32-51-00/501, Nose Wheel Steering System
 C. 
Access
 (1)  
Location Zone
 711 Nose Landing Gear (NLG)
 D. 
Procedure
 S 494-016
 (1)  
Make sure the rig pin NS6 is installed in the interconnect mechanism (AMM 32-51-00/501).
S 434-017
 (2)  
Assemble the bracket, control drum and link with the shaft, spacer, washers and nut if it is necessary (View A-A). Tighten the nut.
S 424-018
 (3)  
Put the control drum assembly in its position adjacent to the four holes on the aft side of the shock strut.
S 424-019
 (4)  
Install and tighten the four bolts (Detail A) to hold the assembly to the shock strut.
S 494-020
 (5)  
Put the rig pin NS7 through the control drum and the bracket (Detail A).
S 434-021
 (6) 
Connect the steering cables NGPPA and NGPPB to the control drum.
S 434-022
 (7)  
Install new cotter pin retainers on the cable ends.
S 434-023
 (8)  
Use the turnbuckles to tighten the cables to the tension shown in Table II (AMM 32-51-00/501).
S 094-024
 (9)  
Make sure you can move the rig pins NS6 and NS7 easily, then remove them.
 (10)
 Connect the spring cartridge to the link.
 S 434-025
 
 32-51-06
 ALL  ú ú 03 Page 404 ú Sep 28/01 
 
A
757 
MAINTENANCE MANUAL
 S 824-040
 (11)
 Make sure the free length position is 17.20+/-0.01 inches for -1 and -2 cartridges, or 16.51+/-0.01 inches for -3 cartridges. Measure between the centerlines of the rod ends of the spring cartridge. If it is necessary, use the procedure in (AMM 32-51-08/401) to adjust the free length of the spring cartridge.
S 434-027
 (12)
 Examine the rod end to make sure it is engaged correctly.
S 434-028
 (13)
 Tighten the lock nut for the spring cartridge to 175 |25 pound-inches.
S 434-029
 (14)
 Install the lockwire.
S 714-030
 (15)
 Do a test of the operation of the rudder pedal disconnect for the nose wheel steering system (AMM 32-51-00/501).
S 824-031
 (16)
 Make sure the cable tension is not changed and tighten the cables if it is necessary.
S 434-032
 (17)
 Install the lock clips on the cable turnbuckle.
S 434-048
 (18)
 Connect the upper to the lower torsion links at the apex joint (AMM 32-21-09/401)
 (19)
 With the steering collar in the center position, remove the towing lever lockpin.
S 864-036
 (20)
 Make sure the towing lever moves to the NORMAL position.
 S 094-035
 CAUTION:_______ MAKE SURE THE STEERING COLLAR IS ACCURATELY IN THE CENTER 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 起落架 CHAPTER 32 - LANDING GEAR 3(126)