• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2011-08-28 17:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

5-Temperature transmitter and temperature indication cables - removal or reinstallation.  Yes  Yes  N/A 
6- Crown line - replacement (where permanently attached to the crown ring).  No  Yes  N/A 
7- Scoop or skirt-replacement or repair of (including fasteners).  Yes  Yes  N/A 
B)BURNER 
8- Burner - cleaning and lubrication.  Yes  Yes  N/A 
9- Piezo igniters - adjustment.  Yes  Yes  N/A 
10- Burner jets - cleaning and replacement.  Yes  Yes  N/A 
11- Burner frame corner buffers - replacement or reinstallation.  Yes  Yes  N/A 
12- Burner Valves - adjustment of closing valve not requiring special tools or test equipment.  Yes  Yes  N/A 
C)BASKET AND GONDOLA 
13- Basket/gondola frame trim - repair or replacement.  Yes  Yes  Yes 
14- Basket/gondola runners (including wheels) - repair or replacement.  Yes  Yes  Yes 
15- External rope handles - repair.  Yes  Yes  Yes 
16- Replacement of seat covers - upholsteries and safety belts.  Yes  Yes  Yes 
D)FUEL CYLINDER 
17- Liquid valve -replacement of O-rings in the outlet.  Yes  Yes  No 
E)INSTRUMENTS AND EQUIPMENT 
18- Batteries - replacement of for self contained instruments and communication equipment.  Yes  Yes  Yes 
19- Communication, navigation devices, instruments and/or equipment – Remove and replace self contained, instrument panel mounted communication devices with quick disconnect connectors.  Yes  Yes  Yes 
F)ENGINES  

20- Cleaning and Lubrication not requiring disassembly other than removal of non-structural items such as cover plates, cowlings and fairings.  Yes  N/A  N/A 
21- Cowling-removal and re-fitment not requiring removal of the propeller  Yes  N/A  N/A 
22- Fuel and oil strainers and/or filter elements - Removal, cleaning and/or replacement  Yes  N/A  N/A 
23- Batteries - replacing and servicing (excluding servicing of Ni-Cd batteries).  Yes  N/A  N/A 
24- Propeller Spinner – removal and installation for inspection.  Yes  N/A  N/A 
25- Powerplant - Removal or installation of powerplant unit including engine and propeller.  Yes  N/A  N/A 
26- Engine- Chip detectors – remove, check and replace.  Yes  N/A  N/A 
27- Ignition Spark Plug – removal or installation and adjustment including gap clearance.  Yes  N/A  N/A 
28- Coolant fluid - replenishment.  Yes  N/A  N/A 
29- Engine Controls -minor adjustments of non-flight or propulsion controls whose operation is not critical for any phase of flight.  Yes  N/A  N/A 
30- Engine instruments - removal and replacement.  Yes  N/A  N/A 
31- Lubrication oil – changing or replenishment of engine oil and gearbox fluid.  Yes  N/A  N/A 
32- Fuel lines -replacement of prefabricated hoses with self- sealing couplings.  Yes  N/A  N/A 
33- Air filters (if installed) – removal, cleaning and replacement  Yes  N/A  N/A 

Appendix I to AMC MCAR-M.302
Content of the maintenance programme

1. General requirements
1.1 The maintenance programme should contain the following basic information.
1.1.1 The  type/model and registration number of the aircraft, engines and, where applicable, auxiliary power units and propellers
1.1.2 The  name and address of the owner,  operator or MCAR-M Subpart G approved organisation managing the aircraft airworthiness.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:马尔代夫民航法规 MCAR-M Continuing Airworthiness(90)