• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2011-08-28 17:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

MCAR-M.305 Aircraft continuing airworthiness record system
(a)
At the  completion of any maintenance, the associated MCAR-M.801 certificate of release to service shall be entered in the aircraft continuing airworthiness records. Each entry shall be made as soon as practicable but in no event more than 30 days after the day of maintenance action.

(b)
The aircraft continuing airworthiness records shall consist of,


1.  
an aircraft logbook, engine logbook(s) or engine module log cards, propeller logbook(s) and log cards for any service life limited component as appropriate, and,

2.
when required in point MCAR-M.306 for commercial air transport or by CAD for commercial operations other than commercial air transport, the operator's technical log.


(c)
The aircraft type and registration mark, the date, together with total flight time and/or flight cycles and/or landings, as appropriate, shall be entered in the aircraft logbooks.

(d)
The aircraft continuing airworthiness records shall contain the current:


1.
status of airworthiness directives and measures mandated by CAD in immediate reaction to a safety problem;

2.
status of modifications and repairs;

3.
status of compliance with maintenance programme;

4.
status of service life limited components;

5.
mass and balance report;

6.
list of deferred maintenance.


(e) In addition to the authorised release document, CAD Form 1 or equivalent, the following information relevant to any component installed shall be entered in the appropriate engine or propeller logbook, engine module or service life limited component log card:
1.
identification of the component, and;

2.
the type, serial  number and registration of the aircraft to which the particular component has been fitted, along with the reference to the installation and removal of the component, and;

3.
the particular component accumulated total flight time and/or flight cycles and/or landings and/or calendar time, as appropriate, and;

4.
the current paragraph (d) information applicable to the component.


(f)
The person responsible for the management of continuing airworthiness tasks pursuant to MCAR-M Subpart B, shall control the records as detailed in this paragraph and present the records to CAD upon request.

(g)
All entries made in the aircraft continuing airworthiness records shall be clear and accurate. When it is necessary to correct an entry, the correction shall be made in a manner that clearly shows the original entry.

(h)
An owner or operator shall ensure that a system has been established to keep the following records for the periods specified:


1.
all detailed maintenance records in respect of the aircraft and any life-limited component fitted thereto, at least 24 months after the aircraft or component was permanently withdrawn from service, and;

2.
the total time and flight cycles as appropriate, of the aircraft and all life-limited components, at least 12 months after the aircraft or component has been permanently withdrawn from service, and;

3.
the time and flight cycles as appropriate, since last scheduled maintenance of the component subjected to a service life limit, at least until the component scheduled maintenance has been superseded by another scheduled maintenance of equivalent work scope and detail, and;

4.
the current status of compliance with maintenance programme such that compliance with the approved aircraft maintenance programme can be established, at least until the aircraft or component scheduled maintenance has been superseded by other scheduled maintenance of equivalent work scope and detail, and;

5.
the current  status of airworthiness directives applicable to the aircraft and components, at least 12 months after the aircraft or component has been permanently withdrawn from service, and;
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:马尔代夫民航法规 MCAR-M Continuing Airworthiness(9)