• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2011-08-28 17:02来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Surface finish -Minor restoration of paint or coating where the underlying primary structure is not affected. This includes application of signal coatings or thin foils as well as Registration markings.  Yes  Yes  Yes 
Fairings – Simple repairs to non-structural fairings and cover plates which do not change the contour.  Yes  Yes  Yes 
52  Doors  Doors - Removal and reinstallation.  Yes  Yes  Yes 
53  Fuselage  Upholstery, furnishing – Minor repairs which do not require disassembly of primary structure or operating systems, or interfere with control systems.  Yes  Yes  Yes 
56  Windows  Side Windows - Replacement if it does not require riveting, bonding or any special process.  Yes  Yes  Yes 
Canopies - Removal and re-fitment.  Yes  Yes  Yes 
Gas dampener – Replacement of Canopy Gas dampener.  Yes  Yes  Yes 
57  Wings  Wing Skids – Removal or reinstallation and service of lower wing skids or wing roller including spring assembly.  Yes  Yes  Yes 
Water ballast – Removal or reinstallation of flexible tanks.  Yes  Yes  Yes 

Turbulator and sealing tapes – Removal or reinstallation of approved sealing tapes and turbulator tapes.  Yes  Yes  Yes 
61  Propeller  Spinner – Removal and reinstallation.  N/A  Yes  Yes 
71  Powerplant installation  Removal or installation of Powerplant unit including engine and propeller.  N/A  Yes  NO 
Cowling - Removal and reinstallation not requiring removal of propeller or disconnection of flight controls.  N/A  Yes  Yes 
Induction System – Inspection and replacement of induction air filter.  N/A  Yes  Yes 
72  Engine  Chip detectors – Removal, checking and reinstallation provided the chip detector is a self sealing type and not electrically indicated.  N/A  Yes  Yes 
73  Engine fuel  Strainer or Filter elements – Cleaning and/or replacement.  N/A  Yes  Yes 
Fuel -Mixing of required oil into fuel.  N/A  Yes  Yes 
74  Ignition  Spark Plugs – Removal, cleaning, adjustment and reinstallation.  N/A  Yes  Yes 
75  Cooling  Coolant – Replenishment of coolant fluid.  N/A  Yes  Yes 
76  Engine Controls  Controls – Minor adjustments of non-flight or propulsion controls whose operation is not critical for any phase of flight.  N/A  Yes  NO 
77  Engine Indicating  Engine Indicating – Removal and replacement of self contained instrument panel mount indicators that have quick-release connectors and do not employ direct reading connections.  N/A  Yes  Yes 
79  Oil System  Strainer or Filter elements – Cleaning and/or replacement.  N/A  Yes  Yes 
Oil – Changing or replenishment of engine oil and gearbox fluid.  N/A  Yes  Yes 

Part D/PILOT-OWNER MAINTENANCE TASKS for BALLOONS/AIRSHIPS
Area and Task  Hot Air Airship  Hot Air Balloon  Gas Balloon 
A)ENVELOPE  
1- Fabric repairs - excluding complete panels (as defined in, and in accordance with, Type Certificate holders' instructions) not requiring load tape repair or replacement.  Yes  Yes  NO 
2- Nose line - Replacement  Yes  N/A  N/A 
3- Banners - fitment, replacement or repair (without sewing).  Yes  Yes  Yes 
4- Melting link (temperature flag) -replacement.  Yes  Yes  N/A 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:马尔代夫民航法规 MCAR-M Continuing Airworthiness(89)