EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-24-01
ALL ú ú N03 Page 408 ú Feb 10/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
(j) Install the protection covers on the cooling air ducts (3 and 8), air signal tube, valve boss on the HPC case, and the openings on the TVBCA valve (5).
S 024-047-N00
(5) If it is necessary to replace the TVBCA valve (5), do the steps that follow:
(a)
Remove the adapter (21) for the air signal tube and gasket (20) from the port on the TVBCA valve (5). 1) Discard the gasket (20).
(b)
Install a protection cap on the opening in the TVBCA valve (5).
TASK 75-24-01-404-016-N00
3. Install the Turbine-Vane-and-Blade Cooling Air-Valve
____________________________________________________
A. Standard Tools and Equipment
(1)
Adapter - Torque, 5/16 inch (3.13 mm), 12 point with 2.56 inches
(65.09 mm) in length
(2)
M303, M305, or M307 Bergen Mechanical Crimper
Bergen Cable Technologies Inc
170 Gregg St
P.O. Box 1300
Lodi, NJ 07644-9982
B.
Consumable Materials
(1)
D00137 Engine Oil, PWA-521
(2)
G00767 Wax - Paraffin, PMC 9552
(3)
G02334 Lockwire, AS3214-02
(4)
G02332 Ferrule, P05-292 (Optional)
(5)
G02335 Cable - Safety, P05-291 (Optional)
C.
Parts
~.............................................................................. | AMM | | AIPC | ................. ............................ | FIG | ITEM | NOMENCLATURE | SUBJECT | FIG | ITEM | ................................................................................ | 401 | 5 | TVBCA Valve | 75-24-03 | 01 | 45 | 2.....….........…...................................…..........…......…........1
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
75-24-01
ALL ú ú N02 Page 409 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 大气 AIR 1(49)