• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-16 10:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 S 644-039-N00

 (24)
 Use engine oil to lubricate the threads of the screws (23) that hold the cover (24) on the terminal box.

 S 214-040-N00

 (25)
 Examine the ground terminal on the inner surface of the cover (24) to make sure the ground lead from the EEC thermocouple cable (20) is correctly attached.


 NOTE: If the ground lead on the W6 cable at the EGT Thermocouple
____ Terminal Box is damaged or missing, you must repair the cable per Unison SB 420081-73-46 or replace it.
 S 414-041-N00
 (26)
 Install the cover (24) on the terminal box with the screws (23).

 S 434-042-N00

 (27)
 Tighten the screws (23) to 16-22 pound-inches (1.8-2.5 newton-meters).

 (28)
 Install the lockwire on the screws (23).


 S 434-043-N00
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 77-21-02
 ALL  ú ú N01 Page 414 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
S 644-044-N00
 (29)
 Use engine oil to lubricate the threads of the bolts (9) that attach the plate (12) and the thermocouple cable clamp to the bracket (13) at the 6 o'clock position.

 S 424-045-N00

 (30)
 At the 6 o'clock position, attach the thermocouple cable clamp to the bracket (15) with the bolt (9).

 S 424-035-N00

 (31)
 Put the left thermocouple cable (2) in the correct position between the bracket (13) and the plate (12).

 S 434-036-N00

 (32)
 With the left thermocouple cable (2) in the correct position, attach the plate (12) to the bracket (13) with the bolts (9).

 S 434-005-N00

 (33)
 Tighten all of the the bolts (9) to 36-40 pound-inches
 (4.1-4.5 newton-meters).


 S 644-037-N00

 (34)
 Use engine oil to lubricate the threads of the bolts (6) that attach the clamps to the flange T brackets on the turbine exhaust case.

 S 424-038-N00

 (35)
 Attach the thermocouple cable clamps to the flange T brackets on the turbine exhaust case with the bolts (6) and the nuts (7).

 S 434-039-N00

 (36)
 Tighten the nuts (7) to 36-40 pound-inches (4.1-4.5 newton-meters).

 E.
Install the Right Thermocouple Cable (Fig. 401).


 S 034-040-N00
 (1)  Remove the four nuts (3 and 4) and washers (5 and 8) from the thermocouple probe studs at the 1 and 4 o'clock positions on the turbine exhaust case.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 77-21-02
 ALL  ú ú N01 Page 415 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
S 424-041-N00
 (2)  Attach the harness leads of the right thermocouple cable to each set of thermocouple studs with the washers (5 and 8) and nuts (3 and 4).
 NOTE: Align the harness leads to make them parallel to each other
____
 before you tighten the nuts (3 and 4).

 S 434-007-N00
 CAUTION: DO NOT TIGHTEN THE NUTS MORE THAN THE MAXIMUM TORQUE THAT IS
_______ SPECIFIED. TOO MUCH TORQUE ON THE NUTS CAN LOOSEN OR CAUSE DAMAGE TO THE THERMOCOUPLE STUDS.
 (3)  Tighten the nuts (3 and 4) to the correct torque as follows:
 (a)  
Tighten the nuts on the alumel (larger diameter) thermocouple probe studs to 18-22 pound-inches (2.0-2.5 newton-meters).

 (b)  
Tighten the nuts on the chromel (smaller diameter) thermocouple probe studs to 15-18 pound-inches (1.7-2.0 newton-meters).


 S 644-043-N00
 (4)  
Use engine oil to lubricate the threads of the bolts (6 and 9), which attach the thermocouple cable clamps to the bracket at the 4 o'clock position.

 S 424-044-N00

 (5)  
At the 4 o'clock position, attach the thermocouple cable clamps to the bracket with the bolts (6 and 9) and nuts (7).

 S 434-045-N00

 (6)  
Tighten the nuts (7) to 36-40 pound-inches (4.1-4.5 newton-meters).


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 发动机指示 ENGINE INDICATING(38)