• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-16 10:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 77-21-02
 ALL  ú ú N01 Page 411 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
(b)  Tighten the nuts on the chromel (smaller diameter) thermocouple probe studs to 15-18 pound-inches (1.7-2.0 newton-meters).
 (4)  S 644-001-N00Use engine oil to lubricate the threads of the bolts (6 and 9), which attach the thermocouple cable clamps to the bracket at the 7 o'clock position.
 (5)  S 424-002-N00At the 7 o'clock position, attach the thermocouple cable clamps to the bracket with the bolts (6 and 9), spacer (17), and nuts (7).
 (6)  S 434-003-N00Tighten the nuts (7) to 36-40 pound-inches (4.1-4.5 newton-meters).
 (7)  S 644-004-N00Use engine oil to lubricate the threads of the bolt (9) which attaches the thermocouple cable clamp to the bracket at the 10 o'clock position.
 (8)  S 424-005-N00At the 10 o'clock position, attach the clamp to the bracket with the bolt (6) and the nut (8).
 (9)  S 434-006-N00Tighten the nut (8) to 36-40 pound-inches (4.1-4.5 newton-meters).
 S 644-007-N00

 (10)
 Use engine oil to lubricate the threads of the bolt (6) which attaches the thermocouple cable clamp to the mounting flange of the thermocouple probe at the 10 o'clock position.

 S 424-008-N00

 (11)
 At the 10 o'clock position, attach the clamp to the mounting flange of the thermocouple probe with the bolt (6).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 77-21-02
 ALL  ú ú N01 Page 412 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
S 434-009-N00
 (12)
 Tighten the bolt (6) to 75-85 pound-inches (8.5-9.6 newton-meters).

 S 024-081-N00

 (13)
 Remove the screws (23) that temporarily attached the cover (24) on the terminal box.

 S 014-011-N00

 (14)
 Remove the cover (24) from the terminal box.

 S 034-030-N00

 (15)
 Remove the nuts (21 and 22) from the terminal box studs.

 S 424-031-N00

 (16)
 Connect the harness leads of the left thermocouple cable (2), right thermocouple cable (1), and EEC thermocouple cable (20) to the applicable studs of the terminal box.

 S 434-032-N00

 (17)
 Install the nuts (21 and 22) on the studs of the terminal box.

 S 434-033-N00

 (18)
 Tighten the nuts (21 and 22) to the correct torque as follows:

 (a)  
Tighten the nuts on the alumel (larger diameter) terminal box studs to 18-22 pound-inches (2.0-2.5 newton-meters).

 (b)  
Tighten the nuts on the chromel (smaller diameter) terminal box studs to 15-18 pound-inches (1.7-2.0 newton-meters).

 


 CAUTION:_______ DO NOT TIGHTEN THE NUTS MORE THAN THE MAXIMUM TORQUE THAT IS
 SPECIFIED.  TOO MUCH TORQUE ON THE NUTS CAN LOOSEN OR CAUSE
 DAMAGE TO THE TERMINAL BOX STUDS.

 S 034-034-N00
 (19) Remove the two screws (25) that temporarily attached the outer clamp half (26) to the inner clamp half (27) and the terminal box.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 77-21-02
 ALL  ú ú N01 Page 413 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
S 644-035-N00
 (20)
 Use engine oil to lubricate the threads of the screws (25) that attach the two halves of the clamp (26 and 27) together.

 S 424-036-N00

 (21)
 Install the left (2) and right (1) thermocouple cables between the two clamp halves (26 and 27).

 S 434-037-N00

 (22)
 With the thermocouple cables (1 and 2) between them, attach the two clamp halves (26 and 27) to the terminal box with the screws (25).

 S 434-038-N00

 (23)
 Tighten the clamp screws (25) to 16-24 pound-inches (1.8-2.7 newton-meters).


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 发动机指示 ENGINE INDICATING(37)