VOR/ADF/DME RMI
Figure 401/TASK 34-57-22-991-002
R 1EFF : 106-149, 201-299, 301-399, 401-499, 1 34-57-22Page 403 1 1 Config-2 Aug 01/05 1 1 1CES 1
TASK 34-57-22-400-002
Installation of the VOR/ADF/DME RMI (21FN)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-13-00-710-001 Operational Test of the Instrument and Panel Integral Lighting 34-14-00-740-001 Interface Test of the IR
3. Job Set-up
__________ Subtask 34-57-22-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU NAV/VOR/DME/RMI 12FN F13 49VU NAV PROBES/ADIRU3/PWR/SWTG 8FP F09 122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04
4. Procedure
_________ Subtask 34-57-22-420-051
A. Installation of the VOR/ADF/DME RMI
(1)
Clean the component interface and/or the adjacent area.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Remove the blanking caps from the electrical connectors (3) and (4).
R 1EFF : 106-149, 201-299, 301-399, 401-499, 1 34-57-22Page 404 1 1 Config-2 Aug 01/05 1 1 1CES 1
(4)
Make sure that the electrical connectors are clean and in the correct
condition.
(5)
Connect the electrical connector (4) to the VOR/ADF/DME RMI (2).
(6)
Install the VOR/ADF/DME RMI (2) in its housing.
(7) Tighten the screws (1). Subtask 34-57-22-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 12FN, 8FP, 4LF
Subtask 34-57-22-710-052
C. Test of the VOR/ADF/DME RMI (21FN)
(1)
Do the BITE test of the IR system (but read only the heading value on the RMI). (Ref. TASK 34-14-00-740-001)
(2)
Do the operational test of the instrument and panel integral lighting (Ref. TASK 33-13-00-710-001)
5. Close-up
________ Subtask 34-57-22-410-051
A. Put the aircraft back to its initial configuration.
(1)
Install the thermoformed cover on the center instrument panel.
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
R 1EFF : 106-149, 201-299, 301-399, 401-499, 1 34-57-22Page 405 1 1 Config-2 Aug 01/05 1 1 1CES 1 **ON A/C ALL
R Post SB 34-1147 For A/C 001-004,051-060,
SATELLITE NAVIGATION - DESCRIPTION AND OPERATION
________________________________________________
1. General
_______ Not applicable. The GPS function is included in the Multi-Mode Receiver (MMR). The GPS is described in AMM 34-36-00 ILS/MMR.
1EFF : ALL 1 34-58-00Page 1 1 1 May 01/05 1 1 1CES 1