5. Close-up
________ Subtask 34-53-11-410-052
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other items.
(2) Remove the access platform(s). Subtask 34-53-11-862-050
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
1EFF : ALL 1 34-53-11Page 413 1 1 May 01/04 1 1 1CES 1 RECEIVER - ADF (2RP1,2RP2) - REMOVAL/INSTALLATION
_________________________________________________
TASK 34-53-31-000-002
Removal of the ADF Receiver (2RP1, 2RP2)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 1.6 m (5 ft. 3 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
34-53-31-991-001 Fig. 401
3. Job Set-up
__________
Subtask 34-53-31-865-052
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU NAV/ADF/1 1RP1 H14 R 121VU COM NAV/ADF/2 1RP2 K02
1EFF : ALL 1 34-53-31Page 401 1 1 Nov 01/02 1 1 1CES 1
R Subtask 34-53-31-010-050
B. Get Access
(1)
Put the access platform in position at the access door 824 in zone
128.
(2)
Open the access door 824.
4. Procedure
_________
(Ref. Fig. 401/TASK 34-53-31-991-001)
Subtask 34-53-31-020-050
A. Removal of the ADF Receiver
(1)
Loosen the nut (4).
(2)
Lower the nut (4).
(3)
Pull the ADF receiver (1) on its rack (3) to disconnect the electrical connectors (2).
(4)
Remove the ADF receiver (1) from its rack (3).
(5)
Put blanking caps on the disconnected electrical connectors (2).
1EFF : ALL 1 34-53-31Page 402 1 1 Nov 01/02 1 1 1CES 1
ADF Receivers
Figure 401/TASK 34-53-31-991-001
1EFF : ALL 1 34-53-31 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 34-53-31-400-002
Installation of the ADF Receiver (2RP1, 2RP2)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NAVIGATION 导航4(158)