• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:27来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).


 (5)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 34-52-00Page 504 1 1 Feb 01/04 1 1 1CES 1


 TASK 34-52-00-710-003 Operational Test of the ATC WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 1. Reason for the Job__________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 34-10-00-860-002 ADIRS Start Procedure 34-10-00-860-005 ADIRS Stop Procedure
 3. Job Set-up
__________ Subtask 34-52-00-860-080
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).

 (3)
 On the center pedestal, on the ATC/TCAS control unit, set:

 -
the ATC system 1(2) on.

 -
the ALT RPTG ON/OFF switch to ON.

 -
the AUTO/ON/STBY switch to AUTO.

 


 1EFF : ALL 1 34-52-00Page 505 1 1 Feb 01/04R 1 1 1CES 1


 Subtask 34-52-00-865-054
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU COM NAV/ATC/1 5SH1 G11 121VU COM NAV/ATC/2 5SH2 K07
 4. Procedure
_________
 Subtask 34-52-00-710-055

 A. Transmission Test
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
On the ATC/TCAS control unit:
 -
set the AUTO ON/STBY switch to ON. On the ATC/TCAS control unit:

 -the ATC FAULT or FAIL indicator light stays off.

 -
set the AUTO ON/STBY switch to  On the ATC/TCAS control unit:
 STBY. - the display stays on.

 

R
 5. Close-up
________
 Subtask 34-52-00-860-062

 A. Put the aircraft back to its initial configuration.
 (1)
 Do the ADIRS Stop Procedure (Ref. TASK 34-10-00-860-005).

 (2)
 De-energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-862-002).


 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 34-52-00Page 506 1 1 May 01/04 1 1 1CES 1


 TASK 34-52-00-720-004 Functional Test of the Altitude Reporting Function NOTE : You must do this test very quickly to prevent interference with air
____ traffic, specially if the aircraft is in the open air. If the test is long you must tell the nearest airport of this test.
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 345200-01
 Functional Test of the Altitude Reporting Function.

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific ATC ground test unit
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 34-10-00-860-002 ADIRS Start Procedure 34-10-00-860-005 ADIRS Stop Procedure 34-13-00-710-004 Operational Test of the ALT DYNAMIC SLEW TEST
 3. Job Set-up
__________ Subtask 34-52-00-860-088
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Do the ADIRS start procedure (Ref. TASK 34-10-00-860-002).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM NAVIGATION 导航4(126)