__________________
Refer to the MPD TASK: 313300-04
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-008 Procedure to Get Access to the SYSTEM
REPORT/TEST/INST Page
31-60-00-860-001 EIS Start Procedure
31-60-00-860-002 EIS Stop Procedure
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
31-33-00-991-002 Fig. 502 R **ON A/C 106-149, 211-299, 301-399, 401-499,
31-33-00-991-002-A Fig. 502A
1EFF : ALL 1 31-33-00Page 515 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
3. Job Set-up
__________
Subtask 31-33-00-861-054
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2)
Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).
(3)
Energize the CFDS (Ref. TASK 31-32-00-860-008).
Subtask 31-33-00-865-059
B.
Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU COM/CVR/CTL 4RK E13
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
121VU FDIU & QAR 8TU K17 **ON A/C ALL
121VU RCDR/ACCLRM 9TU K18
121VU RCDR/DFDR 7TU K16
R **ON A/C 106-149, 211-299, 301-399, 401-499,
121VU AIDS & RCDR/QAR 14TU K17 121VU AIDS & RCDR/FDIMU 5TV K15
1EFF : ALL 1 31-33-00Page 516 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
4. Procedure
_________ R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
Subtask 31-33-00-710-062
A. Do the FDIU fault monitoring via CFDS test.
(Ref. Fig. 502/TASK 31-33-00-991-002)
NOTE : You can print the available information only when the PRINT>
____
indication shows on the MCDU screen.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the control panel 21VU:
-Push the GND/CTL pushbutton.
2. On the MCDU:
-
Push the MCDU MENU mode key.
-
Push the line key adjacent to <CFDS indication.
-
Push the line key adjacent to <SYSTEM REPORT/TEST indication.
-
Push the line key adjacent to INST> indication.
-
Push the line key adjacent to <FDIU indication.
-
Push the line key adjacent to LRU IDENTIFICATION indication.
-Make sure that the FDIU P/N and the A/C registration tail-number is correct.
On the control panel 21VU:
-
The blue indicator light 'ON' comes on.
On the MCDU display:
-
The MCDU MENU page comes into view.
-
The CFDS page comes into view.
-
The SYSTEM REPORT/TEST page comesinto view.
-
The INST page comes into view.
-
The FDIU page comes into view.
-
The FDIU LRU IDENTIFICATION pagecomes into view.
-
The FDIU P/N and the A/C registrationtail-number shows.
R 1EFF : ALL 1 31-33-00Page 517 1 1 May 01/05 1 1 1CES 1
FDIU-Test
Figure 502/TASK 31-33-00-991-002- 12 (SHEET 1)
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 31-33-00Page 518 1201-210, 1May 01/05 1 1 1CES 1
FDIU-Test
Figure 502/TASK 31-33-00-991-002- 22 (SHEET 2)
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 31-33-00Page 519 1201-210, 1May 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------NOTE : The A/C registration tail-number is hard-wired at the Coding Plug
____
197VC-A on the 80VU.
- Push the line key adjacent to - The FDIU page comes into view.
<RETURN indication.
- Push the line key adjacent to - The FDIU TEST page comes into view.
<TEST indication.
- Push the line key adjacent to - The FDIU result page comes into view
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 2(84)