• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 12:12来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 31-32-00-860-008 Procedure to Get Access to the SYSTEM
 REPORT/TEST/INST Page
 31-60-00-860-001 EIS Start Procedure
 31-60-00-860-002 EIS Stop Procedure

 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
 31-33-00-991-001 Fig. 501
R **ON A/C 106-149, 211-299, 301-399, 401-499,
 31-33-00-991-001-A Fig. 501A
 1EFF : ALL 1 31-33-00Page 501 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL


 3. Job Set-up
__________
 Subtask 31-33-00-861-050

 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits
 (Ref. TASK 24-41-00-861-002).


 (2)
 Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. TASK 31-60-00-860-001).


 (3)
 Energize the CFDS (Ref. TASK 31-32-00-860-008).
 Subtask 31-33-00-865-050


 B.
 Make sure that this(these) circuit breaker(s) is(are) closed:


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU COM/CVR/CTL 4RK E13
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,
 121VU FDIU & QAR 8TU K17 **ON A/C ALL
 121VU RCDR/ACCLRM 9TU K18
 121VU RCDR/DFDR 7TU K16

R **ON A/C 106-149, 211-299, 301-399, 401-499,
 121VU AIDS & RCDR/QAR 14TU K17 121VU AIDS & RCDR/FDIMU 5TV K15
 1EFF : ALL 1 31-33-00Page 502 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL


 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,

 (Ref. Fig. 501/TASK 31-33-00-991-001) R **ON A/C 106-149, 211-299, 301-399, 401-499,
 (Ref. Fig. 501A/TASK 31-33-00-991-001-A)
 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-210,

 Subtask 31-33-00-710-050
 A. Do the power interlocks and system monitoring test.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the control panel 21VU:  On the control panel 21VU:
 - with the engines stopped press  - blue light comes on.
 GND/CTL button.
 2. On the MCDU 3 CA1:  On the MCDU screen 3CA1:
 - set the MCDU menu.  - the MCDU menu comes on.
 - set the CFDS menu on the MCDU  - the CFDS menu comes on.
 menu.
 - set the SYSTEM REPORT/TEST menu  - the SYSTEM REPORT/TEST comes on.
 on the CFDS menu.
 - set the INST menu on the SYSTEM  - the INST menu comes on.
 REPORT/TEST menu.
 - set the FDIU menu on the INST  - the FDIU menu comes on.
 menu.

 1EFF : ALL 1 31-33-00Page 503 1 1 Aug 01/05 1 1 1CES 1


 DFDR-Test
 Figure 501/TASK 31-33-00-991-001- 12 (SHEET 1)

R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 31-33-00Page 504 1201-210, 1May 01/05 1 1 1CES 1


 DFDR-Test
 Figure 501/TASK 31-33-00-991-001- 22 (SHEET 2)

R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 31-33-00Page 505 1201-210, 1May 01/05 1 1 1CES 1


 DFDR-Test
 Figure 501A/TASK 31-33-00-991-001-A12 (SHEET 1)

R 1EFF : 106-149, 211-299, 301-399, 401-499, 1 31-33-00Page 506 1 1 Aug 01/05 1 1 1CES 1


 DFDR-Test
 Figure 501A/TASK 31-33-00-991-001-A22 (SHEET 2)

R 1EFF : 106-149, 211-299, 301-399, 401-499, 1 31-33-00Page 507 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-
set the GND SCAN menu on the  - the GND SCAN menu will come on with a

 FDIU menu.  NO FAULT message,or with a fault message showing the equipment at fault and the ATA Ref.

 -
set RETURN on the GND SCAN menu
 and continue to push RETURN
 until back to MCDU menu.

 


R **ON A/C 106-149, 211-299, 301-399, 401-499,
 Subtask 31-33-00-710-050-A
 A. Do the Power Interlocks and System Monitoring Test
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统 2(81)