R R - ICE DET 2 - WING ANTI ICE
R **ON A/C ALL
Subtask 31-32-00-860-075
R B. Access to the SYSTEM REPORT/TEST/ICE & RAIN page **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R (Ref. Fig. 207/TASK 31-32-00-991-007) **ON A/C 401-499,
R R (Ref. Fig. 207A/TASK 31-32-00-991-007-A) **ON A/C ALL
NOTE : The procedure below is applicable to the MCDU 1 or 2.____ The actions and the results of this procedure occur on the MCDU used.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
-
push the MCDU MENU mode key
-
push the line key adjacent to the CFDS indication.
-
push the line key adjacent to the SYSTEM REPORT/TEST indication.
-
push the line key adjacent to the ICE & RAIN indication.
On the MCDU:
-the MCDU MENU page comes into view.
the CFDS MENU page comes into view.
the SYSTEM REPORT/TEST page comes intoview.
the SYSTEM REPORT/TEST/ICE & RAIN pagecomes into view.
1EFF : ALL 1 31-32-00Page 241 1 1 Aug 01/05 1 1 1CES 1
CFDS - SYSTEM REPORT/TEST/ICE & RAIN Page
Figure 207/TASK 31-32-00-991-007
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-32-00Page 242 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
R CFDS - SYSTEM REPORT/TEST/ICE & RAIN Page
R Figure 207A/TASK 31-32-00-991-007-A
R 1EFF : 401-499, 1 31-32-00 Page 243
1 1 Aug 01/05
1 1
1CES 1
TASK 31-32-00-860-008 Procedure to Get Access to the SYSTEM REPORT/TEST/INST Page WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : IGNORE ALL THE ECAM WARNINGS AS LONG AS THE COMPUTER IS IN THE MENU
____ MODE.
1. Reason for the Job__________________ Self Explanatory
2. Job Set-up Information______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 31-32-00-991-008-C Fig. 208
3. Job Set-up
__________ Subtask 31-32-00-860-076
A. Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002)
1EFF : ALL 1 31-32-00Page 244 1 1 Aug 01/05R 1 1 1CES 1
Subtask 31-32-00-865-073
B. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AUTO FLT/MCDU/1 11CA1 B01 121VU CFDS/CFDIU/SPLY 2TW J18 121VU AUTO FLT/MCDU/2 11CA2 N20
**ON A/C ALL
Post SB 31-1163 For A/C 155-156,208-209,
121VU CFDS/CFDIU/BACK/UP 8TW J17
**ON A/C ALL
4. Procedure
_________
Subtask 31-32-00-860-077-C
A. This procedure permits to get access to the systems below:
-
ECAM 1
-
ECAM 2
-FDIU
-CFDIU
-DLRB/DLS *
-MDDU *
-
EIS 1
-
EIS 2
-
EIS 3
-DMU *
(* optional system)
NOTE : Some systems are optional. If they are not installed, they are not
____
shown on the menu page.
1EFF : ALL 1 31-32-00Page 245 1 1 Aug 01/05R 1 1 1CES 1
Subtask 31-32-00-860-078
B. Access to the SYSTEM REPORT/TEST/INST page
(Ref. Fig. 208/TASK 31-32-00-991-008-C)
NOTE : The procedure below is applicable to the MCDU 1 or 2.
____ The actions and the results of this procedure occur on the MCDU used.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
Adjust the brightness of the MCDU screen.
-
push the MCDU MENU mode key On the MCDU:
-the MCDU MENU page comes into view.
-
push the line key adjacent to the the CFDS MENU page comes into view. CFDS indication.
-
push the line key adjacent to the the SYSTEM REPORT/TEST page comes into SYSTEM REPORT/TEST indication. view.