TITLE:  SHEAR TIED FRAMES BETWEEN BS 727 AND 1016  S53-14-B S53-22-B S53-22-F S53-22-J S53-28-D S53-28-F S53-28-G S53-30-B  C53-107-01 C53-202-01 C53-208-01 

I.  INSPECTION OPTIONS - DTR CHECK FORM F-34A Lower lobe frames between BS 727 and BS 1016, stringer S-17L to S-17R.
(1) Frame Inner Chord and Web
(Internal) From Direction 1, using visual inspection methods.

Access:  Access aft cargo compartment 4504 and S2186, remove main cabin equipment, floor panels S2185, side wall panels S2182, S2184, insulation as required and, if installed, auxiliary fuel tank.
Zone(s):  218, 220.
(2) Fail-Safe Chord
(Internal) From Direction 2, using visual inspection methods.

Access: Same as I. (1).
Zone(s): Same as I. (1).

II.  INSPECTION OPTIONS - DTR CHECK FORM F-34B Frames between BS 727 and BS 1016, just above stringer S-17 at crease beam web to frame attach clips.
(1) Frame Inner Chord
(Internal) From Direction 1, using visual inspection methods.

Access:  Remove main cabin equipment, side wall panels S2182, S2184, floor panels S2185 and insulation, as required.
Zone(s):  108.
Original  D6-82669 8.2   FUSELAGE SSI INFORMATION

(2)
Frame Inner Chord (Internal) From Direction 2, at specified locations, using HFEC (Ref. D6-37239, Part 6, 53-10-55).

0.5 elapsed hours and 0.5 manhours are required to accomplish this inspection.
Access: Same as II. (1).
Zone(s): Same as II. (1).


(3)
Frame Web
(Internal) From Direction 3, using visual inspection methods.


Access: Same as II. (1).
Zone(s): Same as II. (1).


(4)
Frame Web (Internal) From Direction 4, at specified locations, using HFEC (Ref. D6-37339, Part 6, 53-10-55).

0.5 elapsed hours and 0.5 manhours are required to accomplish this inspection.
Access: Same as II. (1).
Zone(s): Same as II. (1).


(5)
Fail-Safe Chord
(Internal) From Direction 5, using visual inspection methods.


Access: Same as II. (1).
Zone(s): Same as II. (1).


(6)
Fail-Safe Chord (Internal) From Direction 6, at specified locations, using HFEC (Ref. D6-37339, Part 6, 53-10-55).


0.5 elapsed hours and 0.5 manhours are required to accomplish this inspection.
Access: Same as II. (1).
Zone(s): Same as II. (1).

III.  INSPECTION OPTIONS - DTR CHECK FORM F-34C Frames between BS 727 and BS 1016 from stringer S-13 to S-17.
(1) Web
(Internal) From Direction 1, using visual inspection methods.

Access: Same as II. (1).
Zone(s): Same as II. (1).

8.2    FUSELAGE SSI INFORMATION D6-82669 Original

(2)
Inner Chord (Internal) From Direction 2, using visual inspection methods.

Access: Same as II. (1).
Zone(s): Same as II. (1).
 