• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-10-31 15:52来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Access: Same as I. (1).
Zone(s): Same as I. (1).
II.  INSPECTION OPTIONS - DTR CHECK FORM F-25B From stringer S-20 to stringer S-26 (left and right), SB 540 at stringer locations.
(1) Chord, Web and Doubler
(Internal) From Direction 1, including fastener locations, using visual inspection locations.

Access: Same as I. (1).
Zone(s): Same as I. (1).

8.2   FUSELAGE SSI INFORMATION D6-82669 Original

(2) Chord
(Internal) From Direction 2, at specified locations, using HFEC (Ref. NDT Manual D6-37239, Part 6, 53-10-06). 1.5 elapsed hours and 1.5 manhours are required to accomplish this inspection.
Access:  Same as I. (1). 
Zone(s):  Same as I. (1). 
(3) Chord 

(Internal) From Direction 3, at specified locations, using Ultrasonic (Ref. NDT Manual D6-37239, Part 4,
53-20-01). 1.25 elapsed hours and 2.25 manhours are required to accomplish this inspection.
Access: Same as I. (1).
Zone(s): Same as I. (1).

Original D6-82669 8.2  FUSELAGE SSI INFORMATION


8.2  FUSELAGE SSI INFORMATION D6-82669 Original


Original D6-82669 8.2  FUSELAGE SSI INFORMATION THIS PAGE INTENTIONALLY LEFT BLANK

8.2  FUSELAGE SSI INFORMATION D6-82669 BLANK


N96497
F-29 - FUSELAGE BULKHEAD BS 727
Original D6-82669 8.2  FUSELAGE SSI INFORMATION

F-29  INSPECTION INSTRUCTIONS  REFERENCES  ACCESS MANHOURS 
MPD  CPCP  OTHERS  INSP  MHRS  ELPSD 
TITLE:  FUSELAGE BULKHEAD BS 727  S53-16-A  C53-202-01 C53-208-01  I.(1)  6  3 

I. INSPECTION OPTIONS - DTR CHECK FORM F-29A
Body Station 727 bulkhead, stringer S-18 to stringer S-25, except at horizontal stringer and vertical stiffener locations where F-29B applies.
(1) Fail-Safe Chord, Web, and Doubler
(Internal) From Direction 1, including fastener locations, using visual inspection methods.

Access:  Access through aft cargo door 4504 and through forward portion of aft cargo compartment.  Remove lining S2181, remove access panels 1540, 1541, 1542, 1543, and displace insulation blankets as required.
Zone(s):  218.
(2) Fail-Safe Chord
(Internal) From Direction 2, at specified locations, using HFEC (Ref. NDT Manual D6-37239, Part 6, 53-10-68). 1.0 elapsed hour and 1.0 manhour are required to accomplish this inspection.
Access:  Same as I. (1).
Zone(s):  Same as I. (1).
II. INSPECTION OPTIONS - DTR CHECK FORM F-29B
Body Station 727 bulkhead, stringer S-18 to stringer S-25, at horizontal stringer and vertical stiffener
locations.

(1) Fail-Safe Chord, Web, and Doubler
(Internal) From Direction 1, including fastener locations, using visual inspection methods.

Access: Same as I. (1).
Zone(s): Same as I. (1).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300/400/500 补充结构检查文件 SUPPLEMENTAL STRUCTURAL INSPECTION DOCUMENT 1(59)