A
757
MAINTENANCE MANUAL
ú (d) If access is not necessary for subsequent tasks, install the ú access panels you removed (AMM 28-11-01/401). ú ú TASK 28-00-00-282-027 ú6.ú Fuel System Static Bond Path, No. 2 Tank - Inspection ú A. References ú (1) AMM 28-11-00/201, Fuel Tanks ú (2) AMM 28-11-01/401, Main Tank Access Door ú (3) DWG 343N4001, Tubing Instl - Engine Fuel Feed System ú (4) DWG 344N4001, Tubing Instl - Fueling System ú (5) DWG 346N3001, APU Fuel Feed - Instl - Wing ú B. Access ú (1) Location Zones ú 641 Main tank - rib No. 5 to No. 17 (Right) ú 642 Main tank - rib No. 17 to No. 21 (Right) ú ú C. Procedure ú ú S 282-026 ú (1) For the area in the No. 2 main tank between rib No. 5 and rib ú No. 21, do these steps: ú (a) Remove the applicable access panels on the right wing ú (AMM 28-11-01/401). ú (b) Go into the No. 2 main tank (AMM 28-11-00/201). ú (c) Do this task for all bonding jumpers between rib No. 5 and rib ú No. 21: Inspection of the Electrical Bonding Jumpers in the ú Fuel System. ú 1) Refer to drawings 343N4001, 344N4001 and 346N3001 for ú bonding jumper locations. ú (d) If access is not necessary for subsequent tasks, install the ú access panels you removed (AMM 28-11-01/401). ú ú TASK 28-00-00-282-028 ú7.ú Fuel System Static Bond Path, Center Tank - Inspection ú A. References ú (1) AMM 28-11-00/201, Fuel Tanks ú (2) AMM 28-11-02/401, Center Tank Access Door ú (3) DWG 343N4001, Tubing Instl - Engine Fuel Feed System ú (4) DWG 344N4001, Tubing Instl - Fueling System ú (5) DWG 346N3001, APU Fuel Feed - Instl - Wing ú B. Access ú (1) Location Zones ú 134 Wing Center Section (Right) ú 194 Wing to Body - Forward Lower Half (Right) ú 531 Center Wing Tank (Left) ú 631 Center Wing Tank (Right) ú
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-00-00
ALL ú ú 01.1 Page 206 ú Sep 28/02
A
757
MAINTENANCE MANUAL
ú (2) Access Panels
ú 134AZ Center Wing Tank Access Door
ú 194ER Air Conditioning Access Door
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 燃油 CHAPTER 28 - FUEL 1(14)