EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
28-00-00
ALL ú ú 01.1 Page 204 ú Sep 28/02
A
757 MAINTENANCE MANUAL
S 452-021
(2)
For the fuel system tubing or components, do the subsequent steps:
S 452-022
(3)
Measure the total resistance from the tubing or components, to the adjacent primary structure.
S 772-023
(4) Make sure the resistance is not more than 0.10 ohms. ú ú TASK 28-00-00-282-024 ú5.ú Fuel System Static Bond Path, No. 1 Tank - Inspection ú A. References ú (1) AMM 28-11-00/201, Fuel Tanks ú (2) AMM 28-11-01/401, Main Tank Access Door ú (3) DWG 343N4001, Tubing Instl - Engine Fuel Feed System ú (4) DWG 344N4001, Tubing Instl - Fueling System ú (5) DWG 346N3001, APU Fuel Feed - Instl - Wing ú B. Access ú (1) Location Zones ú 541 Main tank - rib No. 5 to No. 17 (Left) ú 542 Main tank - rib No. 17 to No. 21 (Left) ú ú C. Procedure ú ú S 282-025 ú (1) For the area in the No. 1 main tank between rib No. 5 and rib ú No. 21, do these steps: ú (a) Remove the applicable access panels on the left wing ú (AMM 28-11-01/401). ú (b) Go into the No. 1 main tank (AMM 28-11-00/201). ú (c) Do this task for all bonding jumpers between rib No. 5 and rib ú No. 21: Inspection of the Electrical Bonding Jumpers in the ú Fuel System. ú 1) Refer to drawings 343N4001, 344N4001 and 346N3001 for ú bonding jumper locations.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 燃油 CHAPTER 28 - FUEL 1(13)